WELL · 42-175-31904 · DISTRICT 2
Albrecht H. Gas Unit #1
Goliad County · Mission Valley W(wcx 10600 SEG2) field · Vertical
Albrecht H. Gas Unit #1 (API 42-175-31904) is a plugged well in Goliad County, plugged April 9, 1993, last operated by Petrus Oil Company L.P..
The RRC has issued 4 drilling permits between 1984 and 1989, permitted to 15,500 ft.
Completion filings report 6 formation tops, including Yegua, Cook Mountain, Reclaw, Reclow.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 2, 1989
- Permits on file
- 133
- Phone
- (972) 788-3378
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petrus Oil Company L.P. |
| Production reports | none |
| Latest permit | Petrus Oil Company, L.P.May 4, 1989 |
- 15,500
- total depth, ft
- 4
- permits on file
- May 4, 1989
- last permit issued
- Jul 4, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 4, 1985
- Shut in
- —
- Plugged
- Apr 9, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Albrecht, H. Gas Unit G-2-131627 | Mission Valley, West (Massive-1) | Bridge Oil Company, L. P. | 1 | 0 | 0 | Jan 1993 – Apr 1993 |
| — G-2-117641 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 358856-99 | Recompletion | Petrus Oil Company, L.P. | May 2, 1989 | May 4, 1989 | — | 14,500 |
| 276539-99 | Recompletion | Arco Oil & Gas Co. | May 30, 1985 | May 30, 1985 | — | 14,500 |
| 270257-99 | Recompletion | Arco Oil & Gas Co. | Mar 22, 1985 | Mar 22, 1985 | — | 14,500 |
| 245459-99 | Drill | Arco Oil & Gas Co. | Jul 17, 1984 | Jul 19, 1984 | — | 15,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-117641 | — | — | — | — |
| — | — G-2-131627 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 167 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 5,100 | -4,933 |
| Cook Mountain | 5,573 | -5,406 |
| Reclaw | 8,417 | -8,250 |
| Reclow | 8,417 | -8,250 |
| Luling | 8,850 | -8,683 |
| Massive Wilcox | 9,000 | -8,833 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,008 | 9,028 | Perforated |
| 10,676 | 10,704 | Perforated |
| 12,731 | 12,753 | Perforated |
| 13,526 | 13,570 | Perforated |
| 13,584 | 13,672 | Perforated |
| 13,676 | 13,682 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,053 | 17.5 | 1,695 S |
| 9.625 | 9,724 | 12.25 | 2,785 S |
| 7 | 14,500 | 6.5 | 326 S |
| 5.5 | 14,500 | 6.5 | 326 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 26, 1989 | Aug 28, 1989 | Yes |
| 00 | Sep 20, 1989 | — | — |
| 00 | Sep 20, 1985 | Aug 12, 1985 | — |
| 00 | Sep 7, 1985 | — | — |
| 00 | Aug 6, 1985 | Apr 29, 1985 | — |
| 00 | Jul 12, 1985 | — | — |
| 00 | Apr 4, 1985 | Mar 11, 1985 | — |
| 00 | Mar 20, 1985 | Feb 26, 1985 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-31904 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-31904 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17531904, documented in the API reference.