TEXAS · WELLS · GOLIAD COUNTY · API 42-175-32035 · DISTRICT 02

Marks #1 A

Plugged

Goliad County · Wildcat field  · Vertical

Marks #1 A (API 42-175-32035) is a plugged well in Goliad County, plugged June 17, 1992, last operated by Haggard & Assoc. Inc..

The RRC has issued 4 drilling permits (amended twice) between 1985 and 1991, permitted to 5,300 ft.

Completion filings report 2 formation tops, including Catahoula, Frio.

Operator of record

Haggard & Assoc. Inc.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Feb 18, 1994
Permits on file
11
Phone
(713) 939-1055

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHaggard & Assoc. Inc.
Production reportsnone
Latest permitHaggard & Assoc., Inc.Jul 16, 1991
5,300
total depth, ft
6
permits on file
Jul 16, 1991
last permit issued
Oct 7, 1991
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 7, 1991
Shut in
—
Plugged
Jun 17, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-2-126561——000—
— G-2-141184——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
389523-99RecompletionHaggard & Assoc., Inc.Jul 2, 1991Jul 16, 1991Sep 3, 19915,300
339059-98RecompletionTXO Production Corp.Dec 9, 1987Nov 20, 1987—5,300
339059-99RecompletionTXO Production Corp.Nov 19, 1987Nov 20, 1987—5,300
330930-98RecompletionTXO Production Corp.Jul 10, 1987Jun 3, 1987—5,300
330930-99RecompletionTXO Production Corp.Jun 1, 1987Jun 3, 1987—5,300
274822-99DrillTXO Production Corp.Jun 17, 1985May 13, 1985—5,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 7, 1991Marks G-2-141184WildcatHaggard & Assoc. Inc.Plugged—
Sep 6, 1991Marks -A- G-2-126561Terrell Point E. (Catahoula)Haggard & Assoc. Inc.Plugged—
Jun 17, 1987Marks -A- G-2-124615Terrell Point (3600)TXO Production Corp.Plugged—
May 28, 1985Marks A G-2-116987Terrell Point (3975)TXO Production Corp.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 99 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula2,900-2,801
CatahoulaTOP OF CATAHOULA2,900-2,801
Frio3,400-3,301
FrioTOP OF FRIO3,400-3,301

Perforations

Perforated and open-hole intervals.

FromToType
2,8902,894Perforated
2,9042,908Perforated
3,4463,448Perforated
3,9503,960Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62570912.25—
8.62571012.25295 S
2.8754,1187.8751,270 S
2.8754,1307.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 30, 1992Apr 30, 1992—
00May 1, 1992——
00Mar 17, 1992Sep 20, 1991—
00Jun 9, 1988Apr 29, 1988—
00Mar 14, 1988Dec 16, 1987Yes
00Mar 10, 1988——
00Jul 30, 1987Jun 29, 1987Yes
00Jul 28, 1987——
00Jul 9, 1985Jun 26, 1985—
00Jul 4, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17532035, documented in the API reference.