TEXAS · WELLS · GOLIAD COUNTY · API 42-175-32035 · DISTRICT 02
Marks #1 A
Goliad County · Wildcat field · Vertical
Marks #1 A (API 42-175-32035) is a plugged well in Goliad County, plugged June 17, 1992, last operated by Haggard & Assoc. Inc..
The RRC has issued 4 drilling permits (amended twice) between 1985 and 1991, permitted to 5,300 ft.
Completion filings report 2 formation tops, including Catahoula, Frio.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 18, 1994
- Permits on file
- 11
- Phone
- (713) 939-1055
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Haggard & Assoc. Inc. |
| Production reports | none |
| Latest permit | Haggard & Assoc., Inc.Jul 16, 1991 |
- 5,300
- total depth, ft
- 6
- permits on file
- Jul 16, 1991
- last permit issued
- Oct 7, 1991
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 7, 1991
- Shut in
- —
- Plugged
- Jun 17, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 389523-99 | Recompletion | Haggard & Assoc., Inc. | Jul 2, 1991 | Jul 16, 1991 | Sep 3, 1991 | 5,300 |
| 339059-98 | Recompletion | TXO Production Corp. | Dec 9, 1987 | Nov 20, 1987 | — | 5,300 |
| 339059-99 | Recompletion | TXO Production Corp. | Nov 19, 1987 | Nov 20, 1987 | — | 5,300 |
| 330930-98 | Recompletion | TXO Production Corp. | Jul 10, 1987 | Jun 3, 1987 | — | 5,300 |
| 330930-99 | Recompletion | TXO Production Corp. | Jun 1, 1987 | Jun 3, 1987 | — | 5,300 |
| 274822-99 | Drill | TXO Production Corp. | Jun 17, 1985 | May 13, 1985 | — | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 7, 1991 | Marks G-2-141184 | Wildcat | Haggard & Assoc. Inc. | Plugged | — |
| Sep 6, 1991 | Marks -A- G-2-126561 | Terrell Point E. (Catahoula) | Haggard & Assoc. Inc. | Plugged | — |
| Jun 17, 1987 | Marks -A- G-2-124615 | Terrell Point (3600) | TXO Production Corp. | Plugged | — |
| May 28, 1985 | Marks A G-2-116987 | Terrell Point (3975) | TXO Production Corp. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 99 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,890 | 2,894 | Perforated |
| 2,904 | 2,908 | Perforated |
| 3,446 | 3,448 | Perforated |
| 3,950 | 3,960 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 709 | 12.25 | — |
| 8.625 | 710 | 12.25 | 295 S |
| 2.875 | 4,118 | 7.875 | 1,270 S |
| 2.875 | 4,130 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 30, 1992 | Apr 30, 1992 | — |
| 00 | May 1, 1992 | — | — |
| 00 | Mar 17, 1992 | Sep 20, 1991 | — |
| 00 | Jun 9, 1988 | Apr 29, 1988 | — |
| 00 | Mar 14, 1988 | Dec 16, 1987 | Yes |
| 00 | Mar 10, 1988 | — | — |
| 00 | Jul 30, 1987 | Jun 29, 1987 | Yes |
| 00 | Jul 28, 1987 | — | — |
| 00 | Jul 9, 1985 | Jun 26, 1985 | — |
| 00 | Jul 4, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-32035 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-32035 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17532035, documented in the API reference.