TEXAS · WELLS · GOLIAD COUNTY · MARKS LEASE · API 42-175-32720 · DISTRICT 02
Marks #1S
Goliad County · Terrell Point (Catahoula) field · Vertical
Marks #1S (API 42-175-32720) is a plugged well in Goliad County, plugged January 21, 2006, last operated by Allegro Investments Inc..
The RRC has issued one drilling permit, issued September 30, 1993, permitted to 3,200 ft.
Completion filings report 2 formation tops, including B/Miocene, T/Catahoula.
Its lease has reported 2 barrels of oil and 623K mcf of gas since December 1993, with no volume in the three years through April 2026.
Operator of record
- Based in
- Victoria, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 12, 2019
- Permits on file
- 298
- Phone
- (361) 573-5619
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Allegro Investments Inc. |
| Production reports | Allegro Investments, Inc.through Apr 2005 |
| Latest permit | Allegro Investments, Inc.Sep 30, 1993 |
- 3,200
- total depth, ft
- 1
- permits on file
- Sep 30, 1993
- last permit issued
- Dec 21, 1993
- completed
- 2
- cumulative oil, bbl
- 623K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1994 THROUGH Apr 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 21, 1993
- Shut in
- —
- Plugged
- Jan 21, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Marks G-2-148609 | Terrell Point (Catahoula) | Allegro Investments, Inc. | 1 | 2 | 623K | Dec 1993 – Apr 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Allegro Investments, Inc.Jan 1994 → Apr 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 414788-99 | Drill | Allegro Investments, Inc. | Aug 10, 1993 | Sep 30, 1993 | Dec 1, 1993 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 21, 1993 | Marks G-2-148609 | Terrell Point (Catahoula) | Allegro Investments Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 105 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Miocene | 1,680 | -1,575 |
| T/Catahoula | 2,923 | -2,818 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,924 | 2,926 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 337 | 12.25 | 180 S |
| 4.5 | 3,200 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 13, 1994 | Feb 15, 1994 | Yes |
| 00 | Apr 6, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-32720 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-32720 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17532720, documented in the API reference.