WELL · 42-175-32842 · DISTRICT 2
Wood C #39
Goliad County · Sarco Creek (2800) field · Vertical
Wood C #39 (API 42-175-32842) is a plugged well in Goliad County, plugged May 7, 2003, last operated by Charro Operating L.L.C..
The RRC has issued one drilling permit, issued May 31, 1995, permitted to 5,250 ft.
It was permitted by Export Petroleum Corp. and has since transferred to Charro Operating L.L.C. on the wellbore schedule.
Completion filings report 3 formation tops, including Catahoula, Frio, Vicksburg.
Operator of record
Permitted by Export Petroleum Corp.; the EWA schedule now lists a different operator.
- Based in
- Englewood, CO
- P-5 status
- Active (A)
- P-5 last filed
- Apr 10, 2026
- Permits on file
- 326
- Phone
- (361) 319-3199
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Charro Operating L.L.C. |
| Production reports | Export Petroleum Corporationthrough Jan 1998 |
| Latest permit | Export Petroleum Corp.May 31, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,250
- total depth, ft
- 1
- permits on file
- May 31, 1995
- last permit issued
- Sep 20, 1995
- completed
- 0
- cumulative oil, bbl
- 379K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1995 THROUGH May 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 20, 1995
- Shut in
- —
- Plugged
- May 7, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wood "C" G-2-155137 | Sarco Creek (4700) | Charro Operating, L.L.C. | 1 | 0 | 14.3K | Jul 1995 – May 2003 |
| Wood "C" G-2-156122 | Sarco Creek (2800) | Charro Operating, L.L.C. | 1 | 0 | 365K | Sep 1995 – May 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Export Petroleum CorporationJul 1995 → Jan 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 436403-99 | Drill | Export Petroleum Corp. | May 31, 1995 | May 31, 1995 | Jun 19, 1995 | 5,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 20, 1995 | Wood C G-2-156122 | Sarco Creek (2800) | Charro Operating L.L.C. | Plugged | — |
| Jul 11, 1995 | Wood C G-2-155137 | Sarco Creek (4700) | Charro Operating L.L.C. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 127 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,886 | 2,892 | Perforated |
| 4,730 | 4,740 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 543 | 12.25 | 230 S |
| 4.5 | 5,093 | 7.875 | 1,100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 6, 1996 | Nov 10, 1995 | Yes |
| 00 | Dec 6, 1995 | — | — |
| 00 | Nov 2, 1995 | Aug 10, 1995 | — |
| 00 | Sep 6, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-32842 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-32842 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17532842, documented in the API reference.