WELL · 42-175-33178 · DISTRICT 2
Funk Unit #1
Goliad County · Goliad West (Wilcox 12 180) field · Directional
Funk Unit #1 (API 42-175-33178) is a plugged well in Goliad County, plugged January 13, 2007, last operated by Cico Oil & Gas Company.
The RRC has issued 3 drilling permits between 1999 and 2006, permitted to 14,500 ft.
It was permitted by Ventex Operating Corp. and has since transferred to Cico Oil & Gas Company on the wellbore schedule.
Completion filings report 5 formation tops, including Miocene (undifferentiated), Frio, Yegua, Slick.
Operator of record
Permitted by Ventex Operating Corp.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 20, 2019
- Permits on file
- 227
- Phone
- (281) 884-9269
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Cico Oil & Gas Companythrough Jan 2007 |
| Latest permit | Ventex Operating Corp.Apr 13, 2006 |
- 14,500
- total depth, ft
- 3
- permits on file
- Apr 13, 2006
- last permit issued
- Mar 28, 1999
- completed
- 0
- cumulative oil, bbl
- 1.21M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2000 THROUGH Jan 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 28, 1999
- Shut in
- —
- Plugged
- Jan 13, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Funk Unit G-2-177113 | Old Buzzard (Wilcox) | Cico Oil & Gas Company | 1 | 0 | 1.21M | Mar 2000 – Jan 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cico Oil & Gas CompanyApr 2000 → Jan 2007
- 2Ventex Operating Corp.Jun 2006 → Jun 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 617504-99 | Recompletion | Ventex Operating Corp. | Apr 12, 2006 | Apr 13, 2006 | — | 14,000 |
| 497007-99 | Field transfer | Cico Oil & Gas Co. | Jul 10, 2000 | Jul 10, 2000 | Sep 8, 1999 | 14,500 |
| 486877-99 | Drill | Cico Oil & Gas Co. | Aug 23, 1999 | Sep 1, 1999 | Sep 9, 1999 | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 28, 1999 | Funk Unit G-2-177113 | Goliad West (Wilcox 12 180) | Cico Oil & Gas Company | Plugged | — |
| Mar 28, 1999 | Funk Unit G-2-177113 | Goliad West (Wilcox 12 180) | Cico Oil & Gas Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 167 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,168 | 12,184 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 4,045 | 17.25 | 2,985 S |
| 9.625 | 10,500 | 12.25 | 625 S |
| 5.5 | 13,702 | 8.75 | 575 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 5, 2001 | Jul 14, 2000 | Yes |
| 00 | Jul 14, 2000 | Apr 13, 2000 | Yes |
| 00 | Jun 7, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33178 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33178 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533178, documented in the API reference.