WELL · 42-175-33496 · DISTRICT 2
Jacob Gas Unit #2
Goliad County · Fifteen Mile Creek (Wilcox) field · Temp Abandoned · Vertical
Jacob Gas Unit #2 (API 42-175-33496) is a well in Goliad County operated by Olipdp II LLC, completed June 12, 2003 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued March 10, 2003, permitted to 17,000 ft.
It was permitted by Sanchez Oil & Gas Corporation and has since transferred to Olipdp II LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Yegua, Reklaw, Wilcox, Perdit.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Sanchez Oil & Gas Corporation; the EWA schedule now lists a different operator.
- Based in
- Lafayette, LA
- P-5 status
- Active (A)
- P-5 last filed
- May 18, 2026
- Phone
- (337) 761-1657
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Olipdp II LLC |
| Production reports | Milagro Exploration, LLCthrough Apr 2013 |
| Latest permit | Sanchez Oil & Gas CorporationMar 10, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 17,000
- total depth, ft
- 2
- permits on file
- Mar 10, 2003
- last permit issued
- Jun 12, 2003
- completed
- 0
- cumulative oil, bbl
- 186K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 12, 2003
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jacob Gas Unit G-2-198574 | Fifteen Mile Creek (Wilcox) | Olipdp II, LLC | 1 | 0 | 186K | Jun 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sanchez Oil & Gas CorporationJun 2003 → Nov 2008
- 2Milagro Exploration, LLCDec 2008 → Apr 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 529424-98 | Drill | Sanchez Oil & Gas Corporation | Oct 17, 2003 | Mar 10, 2003 | — | 17,000 |
| 529424-99 | Drill | Sanchez Oil & Gas Corporation | Mar 10, 2003 | Mar 10, 2003 | Mar 19, 2003 | 17,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-198574 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 211 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 14,587 | 14,607 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,230 | 17.5 | 1,515 S |
| 9.625 | 10,617 | 12.25 | 1,165 S |
| 5 | 16,093 | 8.5 | 1,230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 29, 2004 | Aug 8, 2003 | Yes |
| 00 | Jan 23, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33496 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33496 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533496, documented in the API reference.