TEXAS · WELLS · GOLIAD COUNTY · HAWKINS SHALLOW G. U. LEASE · API 42-175-33601 · DISTRICT 02

Hawkins Shallow G. U. #1

Shut in

Goliad County · Marshall S.W. (Miocene 2350) field · Producing  · Vertical

Hawkins Shallow G. U. #1 (API 42-175-33601) is a well in Goliad County operated by Remora Operating LLC, completed February 16, 2004 and listed as producing on the RRC schedule, shut in August 1, 2005.

The RRC has issued one drilling permit (amended once), issued January 6, 2004, permitted to 5,710 ft.

It was permitted by Rincon Petroleum Corporation and has since transferred to Remora Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Frio, Vicksburg, Yegua.

No lease production has been reported under this well’s leases.

Operator of record

Remora Operating LLC

Permitted by Rincon Petroleum Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 1, 2026
Permits on file
2
Phone
(281) 893-9400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRemora Operating LLC
Production reportsChesapeake Operating, Inc.through Jul 2005
Latest permitRincon Petroleum CorporationJan 6, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,710
total depth, ft
2
permits on file
Jan 6, 2004
last permit issued
Feb 16, 2004
completed
0
cumulative oil, bbl
34.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 16, 2004
Shut in
Aug 1, 2005
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hawkins Shallow G. U. G-2-200546Marshall, S.W. (Miocene 2350)Remora Operating, LLC1034.7KFeb 2004 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rincon Petroleum CorporationFeb 2004 → May 2004
  2. 2Chesapeake Operating, Inc.Jun 2004 → Jul 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
540394-98DrillRincon Petroleum CorporationMar 5, 2004Jan 6, 2004Jan 12, 20045,700
540394-99DrillRincon Petroleum CorporationJan 6, 2004Jan 6, 2004—5,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 16, 2004Hawkins Shallow G. U. G-2-200546Marshall S.W. (Miocene 2350)Remora Operating LLCProducing · shut in Aug 1, 20055,710

Formation tops

As filed on W-2/G-1. Subsea from 289 ft elevation.Download CSV →

FormationMD ftSubsea
Frio1,700-1,411
Vicksburg3,278-2,989
Yegua5,000-4,711

Perforations

Perforated and open-hole intervals.

FromToType
2,3172,325Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62571212.25275 S
2.8752,8507.875670 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 2004Mar 15, 2004Yes
00Apr 27, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17533601, documented in the API reference.