WELL · 42-175-33669 · DISTRICT 2

See #1

Shut in

Goliad County · Marshall (Middle Wilcox) field · Temp Abandoned  · Vertical

See #1 (API 42-175-33669) is a well in Goliad County operated by Remora Operating LLC, completed December 17, 2004 and listed as temp abandoned on the RRC schedule, shut in April 1, 2021.

The RRC has issued one drilling permit (amended once), issued October 20, 2004, permitted to 13,300 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Remora Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Yegua, Reklaw, Wilcox, Td Presumed In Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Remora Operating LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 1, 2026
Permits on file
2
Phone
(281) 893-9400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRemora Operating LLC
Production reportsRemora Operating, LLCthrough Mar 2021
Latest permitChesapeake Operating, Inc.Oct 20, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,300
total depth, ft
2
permits on file
Oct 20, 2004
last permit issued
Dec 17, 2004
completed
0
cumulative oil, bbl
145K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 17, 2004
Shut in
Apr 1, 2021
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
See G-2-208005Marshall (Middle Wilcox)Remora Operating, LLC10145KDec 2004 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jan 2005 → Aug 2014
  2. 2Hilcorp Energy CompanySep 2014 → Dec 2017
  3. 3Remora Operating, LLCJan 2018 → Mar 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
552563-98DrillChesapeake Operating, Inc.Nov 9, 2004Oct 20, 2004—14,000
552563-99DrillChesapeake Operating, Inc.Oct 20, 2004Oct 20, 2004Nov 3, 200412,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 17, 2004See G-2-208005Marshall (Middle Wilcox)Remora Operating LLCTemp Abandoned · shut in Apr 1, 202113,300

Formation tops

As filed on W-2/G-1. Subsea from 223 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua1ST YEGUA MARKER5,342-5,119
Reklaw8,929-8,706
WilcoxTOP OF WILCOX9,223-9,000
TD Presumed in Wilcox13,004-12,781

Perforations

Perforated and open-hole intervals.

FromToType
11,04411,231Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,00214.751,210 S
7.6259,9849.875365 S
4.513,2586.75410 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 2005Jan 28, 2005Yes
00May 4, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17533669, documented in the API reference.