WELL · 42-175-33841 · DISTRICT 2
Jacob #3
Goliad County · Fifteen Mile Creek (Wilcox) field · Vertical
Jacob #3 (API 42-175-33841) is a well in Goliad County operated by Milagro Exploration LLC, completed February 14, 2006.
The RRC has issued 2 drilling permits between 2005 and 2008, permitted to 16,200 ft.
Completion filings report 2 formation tops, including Cockfield, Wilcox.
Its 2 leases have reported 14.1K barrels of oil and 732K mcf of gas since February 2006, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 20, 2014
- Permits on file
- 231
- Phone
- (713) 750-1600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Milagro Exploration LLC |
| Production reports | Milagro Exploration, LLCthrough Aug 2013 |
| Latest permit | Milagro Exploration, LLCNov 19, 2008 |
- 16,200
- total depth, ft
- 2
- permits on file
- Nov 19, 2008
- last permit issued
- Feb 14, 2006
- completed
- 14.1K
- cumulative oil, bbl
- 732K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 14, 2006
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Steve Rau et AL O-2-9273 | Brandt, North (Luling) | Olipdp II, LLC | 1 | 14.1K | 56.7K | Jul 2008 – Jul 2026 |
| Jacob G-2-220893 | Fifteen Mile Creek (Wilcox) | Milagro Exploration, LLC | 1 | 0 | 675K | Feb 2006 – Jul 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petrohawk Operating CompanyFeb 2006 → Nov 2007
- 2Milagro Exploration, LLCDec 2007 → Aug 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 674794-99 | Recompletion | Milagro Exploration, LLC | Nov 11, 2008 | Nov 19, 2008 | Jun 2, 2008 | 9,999 |
| 607400-99 | Drill | Petrohawk Operating Company | Oct 5, 2005 | Oct 5, 2005 | Dec 19, 2005 | 16,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-220893 | — | — | — | — |
| — | — O-2-9273 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 205 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,734 | 7,739 | Perforated |
| 14,288 | 14,450 | Perforated |
| 14,930 | 15,006 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,490 | 17.5 | 1,420 S |
| 9.625 | 10,601 | 12.25 | 990 S |
| 5 | 15,480 | 8.5 | 952 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 20, 2009 | Nov 21, 2008 | Yes |
| 00 | Dec 5, 2008 | — | — |
| 00 | Mar 5, 2007 | Jun 2, 2006 | Yes |
| 00 | Nov 7, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33841 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33841 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533841, documented in the API reference.