WELL · 42-175-33915 · DISTRICT 2

Hall #1

Shut in

Goliad County · Marshall (Middle Wilcox) field · Temp Abandoned  · Directional

Hall #1 (API 42-175-33915) is a well in Goliad County operated by Remora Operating LLC, completed October 20, 2006 and listed as temp abandoned on the RRC schedule, shut in May 1, 2022.

The RRC has issued one drilling permit, issued April 26, 2006, permitted to 13,756 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Remora Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Yegua, Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Remora Operating LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 1, 2026
Permits on file
2
Phone
(281) 893-9400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRemora Operating LLC
Production reportsRemora Operating, LLCthrough Apr 2022
Latest permitChesapeake Operating, Inc.Apr 26, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,756
total depth, ft
1
permits on file
Apr 26, 2006
last permit issued
Oct 20, 2006
completed
0
cumulative oil, bbl
1.14M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 20, 2006
Shut in
May 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hall G-2-222962Marshall (Middle Wilcox)Remora Operating, LLC101.14MAug 2006 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Oct 2006 → Aug 2014
  2. 2Hilcorp Energy CompanySep 2014 → Dec 2017
  3. 3Remora Operating, LLCJan 2018 → Apr 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
618231-99DrillChesapeake Operating, Inc.Apr 26, 2006Apr 26, 2006May 14, 200615,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 20, 2006Hall G-2-222962Marshall (Middle Wilcox)Remora Operating LLCTemp Abandoned · shut in May 1, 202213,756

Formation tops

As filed on W-2/G-1. Subsea from 169 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaYEGUA MARKER5,452-5,283
WilcoxWILCOX A12,046-11,877
WilcoxWILCOX C12,222-12,053
WilcoxWILCOX E12,312-12,143
WilcoxWILCOX GRAPEVINE12,985-12,816
WilcoxWILCOX FIR13,153-12,984
WilcoxWILCOX ELM13,189-13,020
WilcoxWILCOX DAFFODIL13,257-13,088
WilcoxWILCOX CHERRY13,386-13,217
WilcoxWILCOX BIRCH13,508-13,339
WilcoxWILCOX ALDER13,586-13,417

Perforations

Perforated and open-hole intervals.

FromToType
12,02612,072Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,50814.751,530 S
7.62510,0717.625475 S
4.513,7886.75480 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 5, 2007Jan 12, 2007—
00Apr 9, 2007Nov 1, 2006Yes
00Dec 8, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17533915, documented in the API reference.