WELL · 42-175-33944 · DISTRICT 2
Salyer-Sherman Unit #1ST
Goliad County · Austin (Wilcox Massive) field · Directional
Salyer-Sherman Unit #1ST (API 42-175-33944) is a well in Goliad County operated by Milagro Exploration LLC, completed September 11, 2006.
The RRC has issued 2 drilling permits between 2006 and 2008, permitted to 13,500 ft.
Completion filings report one formation top, including Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 20, 2014
- Permits on file
- 231
- Phone
- (713) 750-1600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Milagro Exploration LLC |
| Production reports | Milagro Exploration, LLCthrough Feb 2011 |
| Latest permit | Milagro Exploration, LLCAug 11, 2008 |
- 13,500
- total depth, ft
- 2
- permits on file
- Aug 11, 2008
- last permit issued
- Sep 11, 2006
- completed
- 0
- cumulative oil, bbl
- 1.51M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 11, 2006
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Salyer-Sherman Unit G-2-245521 | Austin (Nita) | Amrwr, LLC | 1 | 0 | 383K | Jan 2001 – Jul 2026 |
| Salyer-Sherman Unit G-2-223836 | Austin (Wilcox Massive) | Milagro Exploration, LLC | 1 | 0 | 1.13M | Sep 2006 – May 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1KCS Resources, Inc.Sep 2006 → Nov 2007
- 2Milagro Exploration, LLCDec 2007 → Feb 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 667558-99 | Recompletion | Milagro Exploration, LLC | Jul 25, 2008 | Aug 11, 2008 | Jul 14, 2008 | 13,000 |
| 623347-99 | Drill | KCS Resources, Inc. | Jul 27, 2006 | Jul 27, 2006 | Jul 29, 2006 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-223836 | — | — | — | — |
| — | — G-2-245521 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 170 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 11,000 | -10,830 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,044 | 12,105 | Perforated |
| 12,096 | 12,116 | Perforated |
| 12,211 | 12,215 | Perforated |
| 12,212 | 12,217 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,622 | 17.5 | 1,465 S |
| 10.75 | 4,807 | 12.25 | 770 S |
| 7.625 | 11,153 | 9.875 | 330 S |
| 2.875 | 12,442 | 4.5 | 30 S |
| 4.5 | 13,008 | 6.75 | 285 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 8, 2009 | Dec 12, 2008 | Yes |
| 00 | Mar 11, 2009 | — | — |
| 00 | Apr 27, 2007 | Nov 20, 2006 | Yes |
| 00 | Jan 12, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33944 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33944 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533944, documented in the API reference.