WELL · 42-177-31592 · DISTRICT 1

Valenta #1

Plugged

Gonzales County · Pilgrim (Buda) field  · Vertical

Valenta #1 (API 42-177-31592) is a plugged well in Gonzales County, plugged December 16, 1993, last operated by Modern Exploration Inc..

The RRC has issued 2 drilling permits between 1984 and 1988, permitted to 8,800 ft.

Completion filings report 4 formation tops, including Anacacho, Austin Chalk, Eagle Ford, Buda.

Operator of record

Modern Exploration Inc.

Based in
Sherman, TX
P-5 status
Active (A)
P-5 last filed
Jun 30, 2026
Permits on file
195
Phone
(903) 893-1129

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleModern Exploration Inc.
Production reportsModern Exploration, Inc.through Aug 1993
Latest permitModern Exploration, Inc.Jul 5, 1988
8,800
total depth, ft
2
permits on file
Jul 5, 1988
last permit issued
Jun 25, 1988
completed
0
cumulative oil, bbl
1
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 25, 1988
Shut in
—
Plugged
Dec 16, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Valenta O-1-10360Pilgrim (Austin Chalk)Modern Exploration, Inc.100Jan 1993 – Jan 1994
Valenta O-1-12069Pilgrim (Buda)Modern Exploration, Inc.101Jan 1993 – Jan 1994

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
348372-99RecompletionModern Exploration, Inc.Jun 30, 1988Jul 5, 1988—8,789
262883-99DrillModern Exploration, Inc.Dec 10, 1984Dec 27, 1984Feb 12, 19858,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-10360————
—— O-1-12069————

Formation tops

As filed on W-2/G-1. Subsea from 261 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho8,014-7,753
Austin Chalk8,186-7,925
Eagle Ford8,587-8,326
Buda8,687-8,426

Perforations

Perforated and open-hole intervals.

FromToType
8,3078,396Perforated
8,4008,499Perforated
8,5158,584Perforated
8,6888,718Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,20012.251,200 S
4.58,7827.875316 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 27, 1988Jul 11, 1988Yes
00Jul 16, 1988——
00May 15, 1985Apr 26, 1985—
00May 9, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17731592, documented in the API reference.