WELL · 42-177-32137 · DISTRICT 1
Graham #2H
Gonzales County · Pilgrim (Buda) field · Horizontal
Graham #2H (API 42-177-32137) is a plugged horizontal well in Gonzales County, plugged May 11, 2016, last operated by Sabine Oil & Gas Corporation.
The RRC has issued one drilling permit (amended once), issued November 12, 2010, permitted to 9,000 ft.
It was permitted by Strand Energy, L.C. and has since transferred to Sabine Oil & Gas Corporation on the wellbore schedule.
Completion filings report 8 formation tops, including T/ Anacancho, T/Anacancho, T/ Austin Chalk, T/Austin Chalk.
Operator of record
Permitted by Strand Energy, L.C.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 3, 2025
- Permits on file
- 466
- Phone
- (832) 242-9600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sabine Oil & Gas Corporation |
| Production reports | none |
| Latest permit | Strand Energy, L.C.Nov 12, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 2
- permits on file
- Nov 12, 2010
- last permit issued
- Jan 12, 2011
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2011 THROUGH Jun 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 12, 2011
- Shut in
- —
- Plugged
- May 11, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Graham O-1-15665 | Pilgrim (Buda) | Sabine Oil & Gas Corporation | 1 | 0 | 0 | Jan 2011 – Jun 2016 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 705155-98 | Drill | Strand Energy, L.C. | Jan 5, 2011 | Nov 12, 2010 | Nov 14, 2010 | 9,000 |
| 705155-99 | Drill | Strand Energy, L.C. | Nov 10, 2010 | Nov 12, 2010 | Nov 14, 2010 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-15665 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 261 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/ Anacancho | 7,442 | -7,181 |
| T/Anacancho | 7,442 | -7,181 |
| T/ Austin Chalk | 7,595 | -7,334 |
| T/Austin Chalk | 7,595 | -7,334 |
| T/ Eagleford | 8,040 | -7,779 |
| T/Eagleford | 8,040 | -7,779 |
| T/ Buda | 8,120 | -7,859 |
| T/Buda | 8,120 | -7,859 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 808 | 14.75 | 404 S |
| 7.625 | 7,600 | 9.625 | 600 S |
| 7.625 | 7,600 | 9.875 | 600 S |
| 7.625 | — | 9.625 | 600 S |
| 7.625 | — | 9.875 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 29, 2014 | Apr 11, 2011 | Yes |
| 00 | Apr 2, 2012 | Mar 21, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-177-32137 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-177-32137 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17732137, documented in the API reference.