WELL · 42-177-32493 · DISTRICT 1

Washington #1H

Plugged

Gonzales County · Eagleville (Eagle Ford-1) field  · Horizontal

Washington #1H (API 42-177-32493) is a plugged horizontal well in Gonzales County, plugged November 2, 2015, last operated by FW Eagle Ford I LLC.

The RRC has issued one drilling permit (amended once), issued February 24, 2012, permitted to 14,000 ft.

It was permitted by Penn Virginia Oil & Gas, L.P. and has since transferred to FW Eagle Ford I LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 509K barrels of oil and 366K mcf of gas since July 2012, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

FW Eagle Ford I LLC

Permitted by Penn Virginia Oil & Gas, L.P.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 15, 2026
Permits on file
46
Phone
(713) 722-6500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFW Eagle Ford I LLC
Production reportsFW Eagle Ford I, LLCthrough Apr 2026
Latest permitPenn Virginia Oil & Gas, L.P.Feb 24, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
2
permits on file
Feb 24, 2012
last permit issued
Jul 27, 2012
completed
509K
cumulative oil, bbl
366K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 27, 2012
Shut in
—
Plugged
Nov 2, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Washington O-1-16050Eagleville (Eagle Ford-1)FW Eagle Ford I, LLC3509K366KJul 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 24,361 · prior 12 46,603(-48%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 23,906 · prior 12 42,253(-43%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Penn Virginia Oil & Gas, L.P.Jan 2016 → Nov 2022
  2. 2Rocc Oil & Gas, L.P.Dec 2022 → Dec 2023
  3. 3Baytex Energy USA, Inc.Jan 2024 → Dec 2025
  4. 4FW Eagle Ford I, LLCJan 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
733821-98DrillPenn Virginia Oil & Gas, L.P.Apr 9, 2012Feb 24, 2012May 23, 201214,000
733821-99DrillPenn Virginia Oil & Gas, L.P.Feb 14, 2012Feb 24, 2012May 22, 201214,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 27, 2012Washington O-1-16050Eagleville (Eagle Ford-1)FW Eagle Ford I LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 357 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho9,024-8,667
Austin Chalk9,226-8,869
Eagle Ford9,860-9,503

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,23012.25816 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 16, 2012Aug 28, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17732493, documented in the API reference.