WELL · 42-177-32609 · DISTRICT 1
Hall-Manning #1H
Gonzales County · Eagleville (Eagle Ford-1) field · Producing · Horizontal
Hall-Manning #1H (API 42-177-32609) is a horizontal well in Gonzales County operated by Ensign Natural Resources II LLC, completed November 23, 2019 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued July 2, 2012, permitted to 10,783 ft.
It was permitted by Marathon Oil EF LLC and has since transferred to Ensign Natural Resources II LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.
Its 2 leases have reported 693K barrels of oil and 758K mcf of gas since August 2012, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Ensign Natural Resources II LLC
Permitted by Marathon Oil EF LLC; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 29, 2026
- Permits on file
- 13
- Phone
- (346) 809-4062
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Marathon Oil EF LLC |
| Production reports | Marathon Oil EF LLCthrough Apr 2026 |
| Latest permit | Marathon Oil EF LLCJul 2, 2012 |
- 10,783
- total depth, ft
- 1
- permits on file
- Jul 2, 2012
- last permit issued
- Nov 23, 2019
- completed
- 693K
- cumulative oil, bbl
- 758K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 23, 2019
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hall-Manning O-1-18030 | Eagleville (Eagle Ford-1) | Marathon Oil EF LLC | 4 | 564K | 609K | Aug 2014 – Jul 2026 |
| Manning O-1-16087 | Eagleville (Eagle Ford-1) | Marathon Oil EF LLC | 1 | 129K | 149K | Aug 2012 – Jun 2022 |
Oil, barrels lease total
Last 12 months 14,374 · prior 12 32,736(-56%)
Gas, mcf lease total
Last 12 months 21,859 · prior 12 48,984(-55%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marathon Oil EF LLCSep 2012 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 743411-99 | Drill | Marathon Oil EF LLC | Jun 22, 2012 | Jul 2, 2012 | Jul 21, 2012 | 17,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 23, 2019 | Hall-Manning O-1-18030 | Eagleville (Eagle Ford-1) | Ensign Natural Resources II LLC | Producing | 10,783 |
| Nov 23, 2019 | Manning O-1-16087 | Eagleville (Eagle Ford-1) | Marathon Oil EF LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 282 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 10,080 | -9,798 |
| Austin Chalk | 10,320 | -10,038 |
| Eagle Ford | 10,965 | -10,683 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,306 | 15,397 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 5,028 | 14.75 | 2,683 S |
| 5.5 | 15,500 | 8.75 | 1,715 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 14, 2022 | Feb 25, 2020 | — |
| 00 | May 21, 2020 | Feb 25, 2020 | — |
| 00 | May 22, 2014 | Apr 4, 2014 | — |
| 00 | Mar 5, 2013 | Dec 21, 2012 | — |
| 00 | Nov 5, 2012 | Sep 17, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-177-32609 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-177-32609 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17732609, documented in the API reference.