TEXAS · WELLS · GONZALES COUNTY · BARNHART (EF) A LEASE · API 42-177-32638 · DISTRICT 01

Barnhart (EF) A #1H

Shut in

Gonzales County · Eagleville (Eagle Ford-1) field · Shut In  · Horizontal

Barnhart (EF) A #1H (API 42-177-32638) is a horizontal well in Gonzales County operated by Ensign Natural Resources II LLC, completed January 7, 2024 and listed as shut in on the RRC schedule, shut in October 1, 2025.

The RRC has issued one drilling permit, issued July 27, 2012, permitted to 11,885 ft.

It was permitted by Marathon Oil EF LLC and has since transferred to Ensign Natural Resources II LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Anacacho, Austin Chalk, Austinchalk, Eagle Ford.

Its lease has reported 358K barrels of oil and 829K mcf of gas since December 2012, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Ensign Natural Resources II LLC

Permitted by Marathon Oil EF LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 29, 2026
Permits on file
13
Phone
(346) 809-4062

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnsign Natural Resources II LLC
Production reportsMarathon Oil EF LLCthrough Sep 2025
Latest permitMarathon Oil EF LLCJul 27, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,885
total depth, ft
1
permits on file
Jul 27, 2012
last permit issued
Jan 7, 2024
completed
358K
cumulative oil, bbl
829K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 7, 2024
Shut in
Oct 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barnhart (EF) A O-1-16380Eagleville (Eagle Ford-1)Marathon Oil EF LLC2358K829KDec 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 982 · prior 12 3,058(-68%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 930 · prior 12 3,110(-70%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil EF LLCDec 2012 → Sep 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
744907-99DrillMarathon Oil EF LLCJul 18, 2012Jul 27, 2012Sep 19, 201218,304

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 7, 2024Barnhart (EF) A O-1-16380Eagleville (Eagle Ford-1)Ensign Natural Resources II LLCShut In · shut in Oct 1, 202511,885

Formation tops

As filed on W-2/G-1. Subsea from 247 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho10,815-10,568
Austin Chalk11,078-10,831
Austinchalk11,078-10,831
Eagle Ford11,735-11,488

Perforations

Perforated and open-hole intervals.

FromToType
12,19816,330Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,72912.251,390 S
5.516,5758.752,533 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 8, 2024Feb 27, 2024—
00Jul 9, 2021May 19, 2021—
00Jul 30, 2013Jun 6, 2013—
00Mar 18, 2013Dec 26, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17732638, documented in the API reference.