TEXAS · WELLS · GONZALES COUNTY · BARNHART (EF) C LEASE · API 42-177-32738 · DISTRICT 01

Barnhart (EF) C #2H

Shut in

Gonzales County · Eagleville (Eagle Ford-1) field · Shut In  · Horizontal

Barnhart (EF) C #2H (API 42-177-32738) is a horizontal well in Gonzales County operated by Ensign Natural Resources II LLC, completed November 2, 2023 and listed as shut in on the RRC schedule, shut in June 1, 2025.

The RRC has issued one drilling permit, issued October 17, 2012, permitted to 11,826 ft.

It was permitted by Marathon Oil EF LLC and has since transferred to Ensign Natural Resources II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 1.21M barrels of oil and 2.21M mcf of gas since November 2012, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Ensign Natural Resources II LLC

Permitted by Marathon Oil EF LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 29, 2026
Permits on file
13
Phone
(346) 809-4062

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil EF LLC
Production reportsMarathon Oil EF LLCthrough Jul 2025
Latest permitMarathon Oil EF LLCOct 17, 2012
11,826
total depth, ft
1
permits on file
Oct 17, 2012
last permit issued
Nov 2, 2023
completed
1.21M
cumulative oil, bbl
2.21M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 2, 2023
Shut in
Jun 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barnhart (EF) C O-1-16599Eagleville (Eagle Ford-1)Marathon Oil EF LLC41.21M2.21MNov 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 644 · prior 12 10,619(-94%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 835 · prior 12 17,188(-95%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil EF LLCApr 2013 → May 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
749651-99DrillMarathon Oil EF LLCOct 10, 2012Oct 17, 2012Oct 29, 201217,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 2, 2023Barnhart (EF) C O-1-16599Eagleville (Eagle Ford-1)Ensign Natural Resources II LLCShut In · shut in Jun 1, 202511,826

Formation tops

As filed on W-2/G-1. Subsea from 246 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho10,185-9,939
Austin Chalk10,432-10,186
Austin ChalkAUSTIN CHALK-(UPPER)10,432-10,186
Eagle Ford10,933-10,687
Eagle FordUPPER EAGLE FORD10,933-10,687

Perforations

Perforated and open-hole intervals.

FromToType
11,40217,262Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,68012.251,390 S
5.510,8018.5127 S
5.517,3758.52,080 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 27, 2024Feb 8, 2024—
00Sep 12, 2016Sep 6, 2016—
00Sep 9, 2016Sep 6, 2016—
00Nov 13, 2013Sep 16, 2013Yes
00Oct 14, 2013Aug 14, 2013Yes
00Jul 17, 2013Apr 23, 2013Yes
00May 7, 2013Mar 4, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17732738, documented in the API reference.