WELL · 42-177-32748 · DISTRICT 1

Arledge Ranch Unit #1H

Y

Gonzales County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Arledge Ranch Unit #1H (API 42-177-32748) is a horizontal well in Gonzales County operated by FW Eagle Ford I LLC, completed January 20, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 23, 2012, permitted to 10,262 ft.

It was permitted by Penn Virginia Oil & Gas, L.P. and has since transferred to FW Eagle Ford I LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 225K barrels of oil and 80.1K mcf of gas since December 2012, last reporting in July 2026.

Operator of record

FW Eagle Ford I LLC

Permitted by Penn Virginia Oil & Gas, L.P.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 15, 2026
Permits on file
46
Phone
(713) 722-6500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFW Eagle Ford I LLC
Production reportsFW Eagle Ford I, LLCthrough Apr 2026
Latest permitPenn Virginia Oil & Gas, L.P.Oct 23, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,262
total depth, ft
2
permits on file
Oct 23, 2012
last permit issued
Jan 20, 2013
completed
225K
cumulative oil, bbl
80.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 20, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arledge Ranch Unit O-1-16362Eagleville (Eagle Ford-1)FW Eagle Ford I, LLC1225K80.1KDec 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 1,389 · prior 12 2,133(-35%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 410 · prior 12 0

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Penn Virginia Oil & Gas, L.P.Dec 2012 → Nov 2022
  2. 2Rocc Oil & Gas, L.P.Dec 2022 → Dec 2023
  3. 3Baytex Energy USA, Inc.Jan 2024 → Dec 2025
  4. 4FW Eagle Ford I, LLCJan 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
750065-98DrillPenn Virginia Oil & Gas, L.P.Feb 1, 2013Oct 23, 2012Nov 8, 201214,000
750065-99DrillPenn Virginia Oil & Gas, L.P.Oct 18, 2012Oct 23, 2012Nov 8, 201214,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 20, 2013Arledge Ranch Unit O-1-16362Eagleville (Eagle Ford-1)FW Eagle Ford I LLCProducing10,262

Formation tops

As filed on W-2/G-1. Subsea from 441 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho9,676-9,235
Austin Chalk9,850-9,409
Eagle Ford10,488-10,047

Perforations

Perforated and open-hole intervals.

FromToType
10,91115,061Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,42812.751,686 S
5.515,1308.752,248 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 2013Jan 22, 2013—
00Mar 12, 2013Jan 4, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17732748, documented in the API reference.