TEXAS · WELLS · GONZALES COUNTY · BARNHART (EF) LEASE · API 42-177-32836 · DISTRICT 01
Barnhart (EF) #20H
Gonzales County · Eagleville (Eagle Ford-1) field · Shut In · Horizontal
Barnhart (EF) #20H (API 42-177-32836) is a horizontal well in Gonzales County operated by Ensign Natural Resources II LLC, completed January 22, 2016 and listed as shut in on the RRC schedule, shut in November 1, 2025.
The RRC has issued one drilling permit, issued January 8, 2013, permitted to 10,990 ft.
It was permitted by Marathon Oil EF LLC and has since transferred to Ensign Natural Resources II LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.
Its lease has reported 15M barrels of oil and 18.4M mcf of gas since November 2010, last reporting volume in April 2026. The lease carries 60 wells, so these are lease totals, not this well alone.
Operator of record
Ensign Natural Resources II LLC
Permitted by Marathon Oil EF LLC; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 29, 2026
- Permits on file
- 13
- Phone
- (346) 809-4062
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ensign Natural Resources II LLC |
| Production reports | Marathon Oil EF LLCthrough Apr 2026 |
| Latest permit | Marathon Oil EF LLCJan 8, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,990
- total depth, ft
- 1
- permits on file
- Jan 8, 2013
- last permit issued
- Jan 22, 2016
- completed
- 15M
- cumulative oil, bbl
- 18.4M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2010 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 22, 2016
- Shut in
- Nov 1, 2025
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 60 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Barnhart (EF) O-1-15397 | Eagleville (Eagle Ford-1) | Marathon Oil EF LLC | 60 | 15M | 18.4M | Nov 2010 – Apr 2026 |
Oil, barrels lease total
Last 12 months 1,174,908 · prior 12 1,325,612(-11%)
Gas, mcf lease total
Last 12 months 1,401,133 · prior 12 1,796,482(-22%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hilcorp Energy CompanyDec 2010 → Oct 2011
- 2Marathon Oil EF LLCNov 2011 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 754064-99 | Drill | Marathon Oil EF LLC | Jan 3, 2013 | Jan 8, 2013 | Jun 22, 2013 | 17,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 22, 2016 | Barnhart (EF) O-1-15397 | Eagleville (Eagle Ford-1) | Ensign Natural Resources II LLC | Shut In · shut in Nov 1, 2025 | 10,990 |
Formation tops
As filed on W-2/G-1. Subsea from 230 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 9,722 | -9,492 |
| Austin Chalk | 9,925 | -9,695 |
| Eagle Ford | 10,397 | -10,167 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,014 | 15,914 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 4,665 | 12.25 | 1,370 S |
| 5.5 | 16,006 | 8.5 | 2,110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 6, 2016 | Sep 1, 2016 | — |
| 00 | Sep 2, 2016 | Sep 1, 2016 | — |
| 00 | Oct 14, 2013 | Aug 12, 2013 | Yes |
| 00 | Jul 30, 2013 | Jun 5, 2013 | Yes |
Well logs
3 logs loaded from the RRC's log index, the latest received Sep 21, 2016. Density, Neutron, Resistivity, Sonic. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| RESISTIVITYSpans Anacacho, Austin Chalk, Eagle Ford | TIFF | 4,665 to 16,006 | Sep 21, 2016run Mar 2, 2013 | 1.20 |
| ACOUSTIC POROSITYSpans Anacacho, Austin Chalk, Eagle Ford | TIFF | 4,667 to 10,814 | Nov 21, 2014run Feb 21, 2013 | 2.59 |
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Anacacho, Austin Chalk, Eagle Ford | TIFF | 4,667 to 10,814 | Nov 21, 2014run Feb 21, 2013 | 6.07 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-177-32836 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-177-32836 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17732836, documented in the API reference.