TEXAS · WELLS · GONZALES COUNTY · SMITH-KNANDEL 1 LEASE · API 42-177-32930 · DISTRICT 01

Smith-Knandel 1 #1 H

Y

Gonzales County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Smith-Knandel 1 #1 H (API 42-177-32930) is a horizontal well in Gonzales County operated by Auterra Operating LLC, completed June 20, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 1, 2013, permitted to 6,724 ft.

It was permitted by Forest Oil Corporation and has since transferred to Auterra Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 95.8K barrels of oil and 41.7K mcf of gas since June 2013, last reporting in July 2026.

Operator of record

Auterra Operating LLC

Permitted by Forest Oil Corporation; the EWA schedule now lists a different operator.

Based in
Friendswood, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 18, 2026
Permits on file
11
Phone
(281) 404-3460

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAuterra Operating LLC
Production reportsAuterra Operating, LLCthrough Apr 2026
Latest permitForest Oil CorporationApr 1, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,724
total depth, ft
1
permits on file
Apr 1, 2013
last permit issued
Jun 20, 2013
completed
95.8K
cumulative oil, bbl
41.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 20, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith-Knandel 1 O-1-17046Eagleville (Eagle Ford-1)Auterra Operating, LLC195.8K41.7KJun 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 2,477 · prior 12 3,065(-19%)

05001K202420252026

Gas, mcf lease total

Last 12 months 832 · prior 12 509(+63%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Forest Oil CorporationJun 2013 → Mar 2015
  2. 2Sabine Oil & Gas CorporationApr 2015 → May 2018
  3. 3Auterra Operating, LLCJun 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
759645-99DrillForest Oil CorporationMar 27, 2013Apr 1, 2013Apr 22, 201313,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 20, 2013Smith-Knandel 1 O-1-17046Eagleville (Eagle Ford-1)Auterra Operating LLCProducing6,724

Formation tops

As filed on W-2/G-1. Subsea from 355 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho6,026-5,671
Austin Chalk6,216-5,861
Eagle Ford6,412-6,057

Perforations

Perforated and open-hole intervals.

FromToType
6,83812,790Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,93112.251,584 S
5.512,9068.752,733 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 21, 2013Aug 20, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17732930, documented in the API reference.