TEXAS · WELLS · GONZALES COUNTY · BEALL UNIT LEASE · API 42-177-33119 · DISTRICT 01

Beall Unit #1H

Y

Gonzales County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Beall Unit #1H (API 42-177-33119) is a horizontal well in Gonzales County operated by Eog Resources Inc., completed November 7, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 30, 2013, permitted to 10,811 ft.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 894K barrels of oil and 1.16M mcf of gas since November 2013, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

EOG Resources Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,354
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Apr 2026
Latest permitEOG Resources, Inc.Aug 30, 2013
10,811
total depth, ft
1
permits on file
Aug 30, 2013
last permit issued
Nov 7, 2013
completed
894K
cumulative oil, bbl
1.16M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 7, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beall Unit O-1-17307Eagleville (Eagle Ford-1)EOG Resources, Inc.3894K1.16MNov 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 21,264 · prior 12 27,199(-22%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 64,023 · prior 12 65,611(-2%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Nov 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
768557-99DrillEOG Resources, Inc.Aug 20, 2013Aug 30, 2013Sep 14, 201311,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 7, 2013Beall Unit O-1-17307Eagleville (Eagle Ford-1)EOG Resources Inc.Producing10,811

Formation tops

As filed on W-2/G-1. Subsea from 322 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho9,408-9,086
Austin Chalk9,831-9,509
Eagle Ford10,228-9,906

Perforations

Perforated and open-hole intervals.

FromToType
10,67516,234Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,52712.25870 S
5.516,3248.52,140 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 2014Jan 3, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17733119, documented in the API reference.