TEXAS · WELLS · GONZALES COUNTY · BARNHART (EF) D LEASE · API 42-177-33161 · DISTRICT 01

Barnhart (EF) D #2H

Y

Gonzales County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Barnhart (EF) D #2H (API 42-177-33161) is a horizontal well in Gonzales County operated by Ensign Natural Resources II LLC, completed February 25, 2015 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 4, 2013, permitted to 10,976 ft.

It was permitted by Marathon Oil EF LLC and has since transferred to Ensign Natural Resources II LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Carrizo, Reklaw, Wilcox, Navarro.

Its lease has reported 1.06M barrels of oil and 1.99M mcf of gas since October 2013, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Ensign Natural Resources II LLC

Permitted by Marathon Oil EF LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 29, 2026
Permits on file
13
Phone
(346) 809-4062

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil EF LLC
Production reportsMarathon Oil EF LLCthrough Apr 2026
Latest permitMarathon Oil EF LLCOct 4, 2013
10,976
total depth, ft
2
permits on file
Oct 4, 2013
last permit issued
Feb 25, 2015
completed
1.06M
cumulative oil, bbl
1.99M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 25, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barnhart (EF) D O-1-17171Eagleville (Eagle Ford-1)Marathon Oil EF LLC81.06M1.99MOct 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 9,650 · prior 12 14,816(-35%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 15,295 · prior 12 31,483(-51%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil EF LLCNov 2013 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
770348-98DrillMarathon Oil EF LLCJul 25, 2014Oct 4, 2013Nov 15, 201417,400
770348-99DrillMarathon Oil EF LLCSep 19, 2013Oct 4, 2013Nov 15, 201416,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 25, 2015Barnhart (EF) D O-1-17171Eagleville (Eagle Ford-1)Ensign Natural Resources II LLCProducing10,976

Formation tops

As filed on W-2/G-1. Subsea from 208 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo1,390-1,182
Reklaw1,860-1,652
WilcoxWILCOX - DISPOSAL2,170-1,962
Navarro5,920-5,712
Austin ChalkAUSTIN CHALK - H2S10,674-10,466
Eagle FordEAGLE FORD - H2S10,862-10,654
BudaBUDA - H2S, DISPOSAL——
EdwardsEDWARDS - H2S——

Perforations

Perforated and open-hole intervals.

FromToType
11,53215,863Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,43012.251,255 S
5.515,9158.51,820 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 9, 2015Mar 18, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17733161, documented in the API reference.