TEXAS · WELLS · GONZALES COUNTY · BARNHART (EF) J LEASE · API 42-177-33199 · DISTRICT 01

Barnhart (EF) J #4H

Y

Gonzales County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Barnhart (EF) J #4H (API 42-177-33199) is a horizontal well in Gonzales County operated by Ensign Natural Resources II LLC, completed February 28, 2024 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 17, 2013, permitted to 12,027 ft.

It was permitted by Marathon Oil EF LLC and has since transferred to Ensign Natural Resources II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 1.27M barrels of oil and 2.63M mcf of gas since November 2013, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Ensign Natural Resources II LLC

Permitted by Marathon Oil EF LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 29, 2026
Permits on file
13
Phone
(346) 809-4062

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnsign Natural Resources II LLC
Production reportsMarathon Oil EF LLCthrough Apr 2026
Latest permitMarathon Oil EF LLCOct 17, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,027
total depth, ft
1
permits on file
Oct 17, 2013
last permit issued
Feb 28, 2024
completed
1.27M
cumulative oil, bbl
2.63M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 28, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barnhart (EF) J O-1-17483Eagleville (Eagle Ford-1)Marathon Oil EF LLC41.27M2.63MNov 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 12,938 · prior 12 13,651(-5%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 23,239 · prior 12 30,498(-24%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil EF LLCApr 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
771567-99DrillMarathon Oil EF LLCOct 10, 2013Oct 17, 2013Nov 1, 201320,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 28, 2024Barnhart (EF) J O-1-17483Eagleville (Eagle Ford-1)Ensign Natural Resources II LLCProducing12,027

Formation tops

As filed on W-2/G-1. Subsea from 272 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho10,799-10,527
Austin Chalk10,912-10,640
Austin ChalkAUSTIN CHALK (UPPER)10,912-10,640
Austin ChalkAUSTIN CHALK (LOWER)11,050-10,778
Eagle Ford11,728-11,456
Eagle FordUPPER EAGLE FORD11,728-11,456
Eagle FordLOWER EAGLE FORD11,772-11,500

Perforations

Perforated and open-hole intervals.

FromToType
12,37819,400Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,10212.251,050 S
5.519,5358.52,673 S
5.519,5458.52,673 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 2024Apr 22, 2024—
00Aug 16, 2016Aug 12, 2016Yes
00May 22, 2014Apr 9, 2014Yes
00May 2, 2014Feb 26, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17733199, documented in the API reference.