TEXAS · WELLS · GONZALES COUNTY · TYLER UNIT LEASE · API 42-177-33249 · DISTRICT 01

Tyler Unit #1H

Plugged

Gonzales County · Eagleville (Eagle Ford-1) field  · Horizontal

Tyler Unit #1H (API 42-177-33249) is a plugged horizontal well in Gonzales County, plugged May 11, 2016, last operated by Eog Resources Inc..

The RRC has issued one drilling permit, issued December 16, 2013, permitted to 9,000 ft.

Completion filings report 8 formation tops, including Wilcox, Carrizo, Navarro, Austin Chalk.

Its lease has reported 28.7K barrels of oil and 17.9K mcf of gas since March 2014, with no volume in the three years through August 2026.

Operator of record

EOG Resources Inc.

Based in
Midland, TX
P-5 status
Active – Extension (X)
P-5 last filed
Aug 12, 2026
Permits on file
16,354
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Aug 2015
Latest permitEOG Resources, Inc.Dec 16, 2013
9,000
total depth, ft
1
permits on file
Dec 16, 2013
last permit issued
Mar 13, 2014
completed
28.7K
cumulative oil, bbl
17.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · MAR 2014 THROUGH AUG 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 13, 2014
Shut in
—
Plugged
May 11, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tyler Unit O-1-17561Eagleville (Eagle Ford-1)EOG Resources, Inc.128.7K17.9KMar 2014 – Aug 2015

No volumes reported on these leases in the last three years.

Wells named Tyler Unit

EOG Resources Inc.'s other wells filed under this lease name in Gonzales County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Mar 2014 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
774940-99DrillEOG Resources, Inc.Dec 4, 2013Dec 16, 2013Jan 3, 20149,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 13, 2014Tyler Unit O-1-17561Eagleville (Eagle Ford-1)EOG Resources Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 317 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxWILCOX - DISPOSAL1,598-1,281
Carrizo1,731-1,414
Navarro5,675-5,358
Austin ChalkAUSTIN CHALK - H2S7,270-6,953
Eagle FordEAGLE FORD - H2S7,513-7,196
BudaBUDA - H2S, DISPOSAL——
EdwardsEDWARDS - H2S——
Reklaw——

Perforations

Perforated and open-hole intervals.

FromToType
8,08211,547Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,96812.252,070 S
5.511,6368.51,305 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 2, 2014Apr 15, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17733249, documented in the API reference.