TEXAS · WELLS · GONZALES COUNTY · API 42-177-33440 · DISTRICT 01
Boysen Unit #6H
Gonzales County · Eagleville (Eagle Ford-1) field · Producing · Horizontal
Boysen Unit #6H (API 42-177-33440) is a horizontal well in Gonzales County operated by Eog Resources Inc., completed November 27, 2014 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued August 12, 2014, permitted to 11,147 ft.
Completion filings report 9 formation tops, including Reklaw, Wilcox, Carrizo, Navarro.
Its 2 leases have reported 1.66M barrels of oil and 3.1M mcf of gas since July 2012, last reporting volume in August 2026. The leases carry 14 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Aug 12, 2026
- Permits on file
- 16,354
- Phone
- (713) 651-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Aug 2026 |
| Latest permit | EOG Resources, Inc.Aug 12, 2014 |
- 11,147
- total depth, ft
- 1
- permits on file
- Aug 12, 2014
- last permit issued
- Nov 27, 2014
- completed
- 1.66M
- cumulative oil, bbl
- 3.1M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · AUG 2012 THROUGH AUG 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 27, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 14 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Boysen Unit G-1-295613 | Eagleville (Eagle Ford-1) | EOG Resources, Inc. | 1 | 347K | 779K | Dec 2014 – Aug 2026 |
| Boysen Unit O-1-16107 | Eagleville (Eagle Ford-1) | EOG Resources, Inc. | 13 | 1.31M | 2.33M | Jul 2012 – Aug 2026 |
Oil, barrels lease total
Last 12 months 34,390 · prior 12 47,307(-27%)
Gas, mcf lease total
Last 12 months 103,149 · prior 12 130,803(-21%)
Wells named Boysen Unit
EOG Resources Inc.'s other wells filed under this lease name in Gonzales County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Aug 2012 → Aug 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 791307-99 | Drill | EOG Resources, Inc. | Jul 9, 2014 | Aug 12, 2014 | Oct 12, 2014 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 27, 2014 | Boysen Unit G-1-295613 | Eagleville (Eagle Ford-1) | EOG Resources Inc. | Producing | 11,147 |
| Nov 27, 2014 | Boysen Unit O-1-16107 | Eagleville (Eagle Ford-1) | EOG Resources Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 285 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Reklaw | 3,021 | -2,736 |
| WilcoxWILCOX - DISPOSAL | 3,775 | -3,490 |
| Carrizo | 4,157 | -3,872 |
| Navarro | 8,375 | -8,090 |
| Anacacho | 9,830 | -9,545 |
| Austin ChalkAUSTIN CHALK - H2S | 10,163 | -9,878 |
| Eagle FordEAGLE FORD - H2S | 10,561 | -10,276 |
| BudaBUDA - H2S, DISPOSAL | — | — |
| EdwardsEDWARDS - H2S | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,965 | 16,476 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 4,864 | 12.25 | 1,420 S |
| 5.5 | 16,570 | 8.5 | 2,070 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 27, 2023 | Sep 13, 2023 | Yes |
| 00 | May 22, 2015 | Jan 14, 2015 | Yes |
Well logs
1 log loaded from the RRC's log index, 1 of it with a digital LAS file, the latest received Dec 1, 2017. Gamma ray. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| Gamma RaySpans Carrizo, Navarro, Anacacho, Austin Chalk, Eagle Ford | LAS + TIFF | 7,000 to 16,140 | Dec 1, 2017 | 0.90 + 7.06 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-177-33440 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-177-33440 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17733440, documented in the API reference.