TEXAS · WELLS · GONZALES COUNTY · BARNHART (EF) D LEASE · API 42-177-33459 · DISTRICT 01

Barnhart (EF) D #7H

Shut in

Gonzales County · Eagleville (Eagle Ford-1) field · Shut In  · Horizontal

Barnhart (EF) D #7H (API 42-177-33459) is a horizontal well in Gonzales County operated by Ensign Natural Resources II LLC, completed December 21, 2015 and listed as shut in on the RRC schedule, shut in December 1, 2024.

The RRC has issued one drilling permit, issued August 21, 2014, permitted to 10,984 ft.

It was permitted by Marathon Oil EF LLC and has since transferred to Ensign Natural Resources II LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Carrizo, Reklaw, Wilcox, Navarro.

Its lease has reported 1.06M barrels of oil and 1.99M mcf of gas since October 2013, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Ensign Natural Resources II LLC

Permitted by Marathon Oil EF LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 29, 2026
Permits on file
13
Phone
(346) 809-4062

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil EF LLC
Production reportsMarathon Oil EF LLCthrough Apr 2026
Latest permitMarathon Oil EF LLCAug 21, 2014
10,984
total depth, ft
1
permits on file
Aug 21, 2014
last permit issued
Dec 21, 2015
completed
1.06M
cumulative oil, bbl
1.99M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 21, 2015
Shut in
Dec 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barnhart (EF) D O-1-17171Eagleville (Eagle Ford-1)Marathon Oil EF LLC81.06M1.99MOct 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 9,650 · prior 12 14,816(-35%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 15,295 · prior 12 31,483(-51%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil EF LLCNov 2013 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
792640-99DrillMarathon Oil EF LLCJul 25, 2014Aug 21, 2014Dec 28, 201417,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 21, 2015Barnhart (EF) D O-1-17171Eagleville (Eagle Ford-1)Ensign Natural Resources II LLCShut In · shut in Dec 1, 202410,984

Formation tops

As filed on W-2/G-1. Subsea from 209 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo1,390-1,181
Reklaw1,860-1,651
WilcoxWILCOX - DISPOSAL2,170-1,961
Navarro5,920-5,711
Austin ChalkAUSTIN CHALK - H2S10,717-10,508
Eagle FordEAGLE FORD - H2S11,363-11,154
BudaBUDA - H2S, DISPOSAL——
EdwardsEDWARDS - H2S——

Perforations

Perforated and open-hole intervals.

FromToType
11,59216,402Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,46312.251,270 S
5.516,4608.51,925 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 17, 2016Aug 12, 2016Yes
00Jul 9, 2015Mar 18, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17733459, documented in the API reference.