WELL · 42-179-30653 · DISTRICT 10
Patterson #1
Gray County · Panhandle Gray County Field field · Vertical
Patterson #1 (API 42-179-30653) is a well in Gray County operated by Stahl Petroleum CO., completed September 1, 1979.
The RRC has issued 2 drilling permits between 1978 and 1999, permitted to 3,200 ft.
Completion filings report 3 formation tops, including Brown Dolomite, Granite Wash, Weathered Granite.
No lease production has been reported under this well’s leases.
Operator of record
Amarillo, TX · P-5 Y, filed Aug 2, 2002 · 97 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stahl Petroleum Co. |
| Production reports | Scout Energy Management LLCthrough Jun 2014 |
| Latest permit | Stahl Petroleum Co.Mar 23, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 2
- permits on file
- Mar 23, 1999
- last permit issued
- Sep 1, 1979
- completed
- 0
- cumulative oil, bbl
- 57.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 1, 1979
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Patterson G-14-172904 | Panhandle, West | Bce-Mach III LLC | 1 | 0 | 57.5K | Apr 1999 – Jul 2026 |
| Patterson O-14-4476 | Panhandle Gray County Field | Stahl Petroleum Co. | 1 | 0 | 0 | Jan 1993 – Jun 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stahl Petroleum Co.Jun 1999 → Jan 2003
- 2Stahl Properties, LLPFeb 2003 → Sep 2013
- 3Scout Energy Management LLCDec 2013 → Jun 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 482707-99 | Reclass | Stahl Petroleum Co. | Feb 16, 1999 | Mar 23, 1999 | Apr 5, 1999 | 2,450 |
| 32985-99 | Drill | Stahl Petroleum Co. | Sep 19, 1978 | Sep 19, 1978 | Oct 25, 1978 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-172904 | — | — | — | — |
| — | — O-14-4476 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,823 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,268 | 555 |
| Granite Wash | 2,325 | 498 |
| Weathered Granite | 2,427 | 396 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,484 | 2,622 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 286 | 12.25 | 200 S |
| 2.375 | 2,620 | — | — |
| 5.5 | 3,024 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 14, 1999 | May 5, 1999 | — |
| 00 | Jun 2, 1999 | — | — |
| 00 | Jan 12, 1984 | Sep 27, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-179-30653 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-179-30653 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17930653, documented in the API reference.