TEXAS · WELLS · GRAY COUNTY · TIMMY LEASE · API 42-179-30749 · DISTRICT 08
Timmy #1
Gray County · Panhandle East field · Producing · Vertical
Timmy #1 (API 42-179-30749) is a well in Gray County operated by Black Resources, completed May 15, 1980 and listed as producing on the RRC schedule, shut in August 1, 2026.
The RRC has issued one drilling permit, issued January 18, 1980, permitted to 3,200 ft.
It was permitted by Road Runner Oil CO. #3 and has since transferred to Black Resources on the wellbore schedule.
Completion filings report 2 formation tops, including Brown Dolomite, Granite Wash.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Road Runner Oil Co. #3; the EWA schedule now lists a different operator.
- Based in
- Borger, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 27, 2026
- Phone
- (806) 486-3678
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Travelers Oil Company |
| Production reports | Black Resourcesthrough Mar 2026 |
| Latest permit | Road Runner Oil Co. #3Jan 18, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 1
- permits on file
- Jan 18, 1980
- last permit issued
- May 15, 1980
- completed
- 0
- cumulative oil, bbl
- 2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 15, 1980
- Shut in
- Aug 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Timmy G-14-116997 | Panhandle, East | Black Resources | 1 | 0 | 2K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 857 · prior 12 493(+74%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Travelers Oil CompanyJan 1993 → Dec 1994
- 2Black ResourcesApr 2024 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 70102-99 | Drill | Road Runner Oil Co. #3 | Jan 18, 1980 | Jan 18, 1980 | Feb 4, 1980 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 15, 1980 | Timmy G-14-116997 | Panhandle East | Black Resources | Producing · shut in Aug 1, 2026 | 3,200 |
| May 15, 1980 | Timmy O-14-4577 | Panhandle Gray County Field | Travelers Oil Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,690 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,162 | 528 |
| Granite Wash | 2,166 | 524 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,622 | 2,914 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 314 | 13.75 | 230 S |
| 2.375 | 2,900 | — | — |
| 5.5 | 2,992 | 10.75 | 250 S |
| 5.5 | 2,993 | 10.75 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 19, 1985 | Jun 13, 1985 | — |
| 00 | Aug 1, 1985 | — | — |
| 00 | Jan 12, 1984 | May 21, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-179-30749 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-179-30749 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17930749, documented in the API reference.