WELL · 42-179-31629 · DISTRICT 10

Schafer Ranch #286

N

Gray County  · Vertical

Schafer Ranch #286 (API 42-179-31629) is a disposal or injection well in Gray County operated by Texaco Producing Inc. under an active UIC permit.

The RRC has issued 2 drilling permits between 1984 and 1986, permitted to 3,600 ft.

Completion filings report one formation top, including Brown Dolomite.

Its lease has reported 317K barrels of oil and 506K mcf of gas since January 1993, last reporting in July 2026. The lease carries 205 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Texaco Producing Inc.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1990
Permits on file
780
Phone
(432) 688-4643

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsM5OEXIT, LLCthrough Mar 2023
Latest permitTexaco Producing Inc.Mar 26, 1986
3,600
total depth, ft
2
permits on file
Mar 26, 1986
last permit issued
—
completed
317K
cumulative oil, bbl
506K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 205 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schafer Ranch East O-14-6568Panhandle Carson County FieldM5OEXIT, LLC205317K506KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Caldwell Production Co. Inc.Jan 1993 → Mar 2007
  2. 2Gryphon Production Company, LLCApr 2007 → Aug 2008
  3. 3Legacy Reserves Operating LPSep 2008 → Apr 2015
  4. 4Mac 5 Operating, LLCMay 2015 → Feb 2021
  5. 5M5OEXIT, LLCMar 2021 → Mar 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
300266-99DrillTexaco Producing Inc.Mar 20, 1986Mar 26, 1986—3,600
238305-99DrillGetty Oil Co.Apr 4, 1984May 2, 1984Jun 11, 19843,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-6568————

Formation tops

As filed on W-2/G-1. Subsea from 3,233 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,054179

Perforations

Perforated and open-hole intervals.

FromToType
3,1323,140Perforated
3,1463,150Perforated
3,1583,162Perforated
3,1663,170Perforated
3,1763,178Perforated
3,1953,204Perforated
3,2063,214Perforated
3,2283,232Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625589—300 S
5.53,59412.25175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 3, 1988Jan 16, 1986Yes
00Sep 27, 1988——
00Apr 28, 1986Jan 16, 1986Yes
00Apr 25, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
107K
bbl, all reported
Apr 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000054444H-1 InjectionActive003,132–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17931629, documented in the API reference.