TEXAS · WELLS · GRAY COUNTY · API 42-179-31938 · DISTRICT 08

Johnson Ranch Unit #W 01

Plugged

Gray County · Panhandle Gray County Field field  · Vertical

Johnson Ranch Unit #W 01 (API 42-179-31938) is a plugged well in Gray County, plugged July 25, 1991, last operated by Bce-Mach Iii LLC.

The RRC has issued one drilling permit, issued October 12, 1988, permitted to 900 ft.

It was permitted by Phillips Petroleum Company and has since transferred to Bce-Mach Iii LLC on the wellbore schedule.

Completion filings report one formation top, including Red Beds.

Its 2 leases have reported 1.3M barrels of oil and 286K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 69 wells, so these are lease totals, not this well alone.

Operator of record

Bce-Mach III LLC

Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active – Extension (X)
P-5 last filed
May 18, 2026
Permits on file
10
Phone
(405) 252-8100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBce-Mach III LLC
Production reportsBce-Mach III LLCthrough Aug 2022
Latest permitPhillips Petroleum CompanyOct 12, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

900
total depth, ft
1
permits on file
Oct 12, 1988
last permit issued
Dec 16, 1988
completed
1.3M
cumulative oil, bbl
286K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 16, 1988
Shut in
—
Plugged
Jul 25, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 69 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson Ranch Unit O-14-6772Panhandle Gray County FieldBce-Mach III LLC691.3M286KJan 1993 – Aug 2022
— O-14-2283——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJan 1993 → Jul 1999
  2. 2Stephens & Johnson Operating Co.Aug 1999 → Apr 2012
  3. 3Scout Energy Management LLCMay 2012 → Jun 2022
  4. 4Bce-Mach III LLCJul 2022 → Aug 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
352180-99DrillPhillips Petroleum CompanyOct 12, 1988Oct 12, 1988—900

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 16, 1988Johnson Ranch Unit O-14-6772Panhandle Gray County FieldBce-Mach III LLCPlugged—
Dec 16, 1988Johnson -CC- O-14-2283Panhandle Gray County FieldPhillips Petroleum CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,931 ft elevation.Download CSV →

FormationMD ftSubsea
Red Beds3002,631

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37538019550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 16, 1989Mar 21, 1989Yes
00Apr 28, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17931938, documented in the API reference.