WELL · 42-179-32227 · DISTRICT 10
Shaw A #2
Gray County · Vertical
Shaw A #2 (API 42-179-32227) is a permitted well in Gray County filed by Cimarex Energy CO. Of Colorado; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1997 and 2008, permitted to 3,000 ft.
Completion filings report 5 formation tops, including Open Hole, Brown Dolomite, Granite Wash, Granite Basement.
Operator of record
Cimarex Energy Co. of Colorado
Midland, TX · P-5 Y, filed Feb 4, 2026 · 476 permits on file · (800) 969-4789
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Bce-Mach III LLCthrough Apr 2026 |
| Latest permit | Cimarex Energy Co. of ColoradoSep 16, 2008 |
- 3,000
- total depth, ft
- 2
- permits on file
- Sep 16, 2008
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 382K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1997 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Shaw -A- G-14-164194 | Panhandle, West | Bce-Mach III LLC | 1 | 0 | 382K | Jun 1997 – Jul 2026 |
Gas, mcf lease total
Last 12 months 5,802 · prior 12 6,024(-4%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gruy Petroleum Management Co.Jun 1997 → Apr 2006
- 2Cimarex Energy Co. of ColoradoMay 2006 → Sep 2014
- 3Scout Energy Management LLCOct 2014 → Jun 2022
- 4Bce-Mach III LLCJul 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 670048-99 | Recompletion | Cimarex Energy Co. of Colorado | Aug 28, 2008 | Sep 16, 2008 | — | 3,000 |
| 456878-99 | Drill | Gruy Petroleum Management Co. | Dec 31, 1996 | Jan 2, 1997 | Feb 26, 1997 | 2,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-164194 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,887 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Open Hole | 2,356 | 531 |
| Brown Dolomite | 2,398 | 489 |
| Granite Wash | 2,472 | 415 |
| Granite Basement | 2,488 | 399 |
| Igneous Basement | 2,720 | 167 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,398 | 2,539 | Open hole |
| 2,560 | 2,580 | Perforated |
| 2,600 | 2,620 | Perforated |
| 2,630 | 2,650 | Perforated |
| 2,660 | 2,680 | Perforated |
| 2,700 | 2,720 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 328 | 12.25 | 390 S |
| 7 | 2,356 | 8.75 | 70 S |
| 4.5 | 2,804 | — | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 13, 2009 | Nov 4, 2008 | — |
| 00 | Oct 16, 1997 | Jun 30, 1997 | Yes |
| 00 | Sep 11, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-179-32227 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-179-32227 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17932227, documented in the API reference.