WELL · 42-181-30708 · DISTRICT 13

Blazek #2

Plugged

Grayson County  · Vertical

Blazek #2 (API 42-181-30708) is a plugged well in Grayson County, plugged January 17, 1980, last operated by Harper, Wayne.

The RRC has issued one drilling permit, issued December 28, 1979, permitted to 4,861 ft.

Operator of record

Harper, Wayne

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 9, 2010
Permits on file
171
Phone
(214) 363-6794

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitHarper, WayneDec 28, 1979
4,861
total depth, ft
1
permits on file
Dec 28, 1979
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 17, 1980

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
67689-99DrillHarper, WayneDec 28, 1979Dec 28, 1979—4,861

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18130708, documented in the API reference.