WELL · 42-181-31294 · DISTRICT 9

Davis Unit #1

Y

Grayson County · Southmayd North (Baker-Viola) field · Producing  · Vertical

Davis Unit #1 (API 42-181-31294) is a well in Grayson County operated by Felderhoff Production Company, completed March 1, 1996 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 15, 1995, permitted to 8,240 ft.

Completion filings report 3 formation tops, including Baker Sd, Middle Davis, Lower Davis.

Its lease has reported 89.4K barrels of oil and 311K mcf of gas since March 1996, last reporting in July 2026.

Operator of record

Felderhoff Production Company

Based in
Muenster, TX
P-5 status
Active (A)
P-5 last filed
Mar 31, 2026
Permits on file
468
Phone
(940) 759-3631

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFelderhoff Production Company
Production reportsFelderhoff Production Companythrough Apr 2026
Latest permitFelderhoff Production Co.Dec 15, 1995
8,240
total depth, ft
1
permits on file
Dec 15, 1995
last permit issued
Mar 1, 1996
completed
89.4K
cumulative oil, bbl
311K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 1, 1996
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis Unit O-13-29103Southmayd, North (Baker-Viola)Felderhoff Production Company189.4K311KMar 1996 – Jul 2026

Oil, barrels lease total

Last 12 months 860 · prior 12 795(+8%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 4,076 · prior 12 3,564(+14%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Felderhoff Production CompanyMar 1996 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
442688-99DrillFelderhoff Production Co.Dec 11, 1995Dec 15, 1995Jan 16, 19968,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 1, 1996Davis Unit O-13-29103Southmayd North (Baker-Viola)Felderhoff Production CompanyProducing8,240

Formation tops

As filed on W-2/G-1. Subsea from 775 ft elevation.Download CSV →

FormationMD ftSubsea
Baker SD7,332-6,557
Middle Davis7,888-7,113
Lower Davis8,000-7,225

Perforations

Perforated and open-hole intervals.

FromToType
7,8887,894Perforated
7,8987,605Perforated
8,0008,006Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,50512.251,005 S
5.58,2407.875690 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 1996Mar 6, 1996Yes
00Mar 14, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18131294, documented in the API reference.