WELL · 42-181-31458 · DISTRICT 9

Lawrence Trust Unit #1HX

N

Grayson County · Big Mineral Creek (Viola) field  · Horizontal

Lawrence Trust Unit #1HX (API 42-181-31458) is a horizontal well in Grayson County operated by Jetta Operating Company Inc., completed August 1, 2012.

The RRC has issued 2 drilling permits (amended once) between 2009 and 2012, permitted to 9,100 ft.

Completion filings report 5 formation tops, including Davis, Base Baker, Lower Davis, Viola.

Its 2 leases have reported 512K barrels of oil and 1.33M mcf of gas since March 2010, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Jetta Operating Company Inc.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
605
Phone
(817) 639-2332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJetta Operating Company Inc.
Production reportsJetta Operating Company, Inc.through Apr 2026
Latest permitJetta Operating Company, Inc.Apr 23, 2012
9,100
total depth, ft
3
permits on file
Apr 23, 2012
last permit issued
Aug 1, 2012
completed
512K
cumulative oil, bbl
1.33M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 1, 2012
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lawrence Trust Unit G-13-291800Big Mineral Creek (Viola)Jetta Operating Company, Inc.1099.5KOct 2021 – Jul 2026
Lawrence Trust Unit O-13-31727Big Mineral Creek (Viola)Jetta Operating Company, Inc.3512K1.23MMar 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 19,630 · prior 12 35,576(-45%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jetta Operating Company, Inc.Apr 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
738176-99RecompletionJetta Operating Company, Inc.Apr 13, 2012Apr 23, 2012May 3, 20129,100
685547-98DrillJetta Operating Company, Inc.Jun 22, 2010Oct 16, 2009Nov 29, 20099,100
685547-99DrillJetta Operating Company, Inc.Sep 25, 2009Oct 16, 2009Nov 29, 20098,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-291800————
—— O-13-31727————
—— O-13-31727————

Formation tops

As filed on W-2/G-1. Subsea from 738 ft elevation.Download CSV →

FormationMD ftSubsea
Davis7,326-6,588
Base Baker7,690-6,952
Lower Davis8,105-7,367
Viola8,339-7,601
Violoa8,339-7,601
Viola8,374-7,636
ViolaVIOLA AT POP8,510-7,772
ViolaVIOLA AT BHL8,859-8,121

Perforations

Perforated and open-hole intervals.

FromToType
8,85512,020Perforated
8,85512,045Perforated
8,89212,095Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.8752,29312.25975 S
9.6252,29312.5975 S
78,8558.75520 S
78,8558.8755,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 2, 2022Nov 17, 2021—
00Feb 4, 2013Sep 10, 2012Yes
00Jan 9, 2013Apr 23, 2010Yes
00Jan 25, 2011Apr 23, 2010Yes
00Jan 13, 2011——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18131458, documented in the API reference.