WELL · 42-183-30721 · DISTRICT 6

Smith David G.U. 1 #3C

N

Gregg County · Danville (Travis Peak) field  · Vertical

Smith David G.U. 1 #3C (API 42-183-30721) is a well in Gregg County operated by Geo-Vest Of Texas Inc., completed August 29, 1988.

The RRC has issued 2 drilling permits (amended once) between 1988 and 1989, permitted to 9,310 ft.

Completion filings report 3 formation tops, including Top Of Massive Anhy., James Lime, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Geo-Vest of Texas Inc.

Based in
Kilgore, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 5, 2012
Permits on file
196
Phone
(903) 643-0402

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGeo-Vest of Texas Inc.
Production reportsTitan Rock E&P, LLCthrough Jul 2022
Latest permitGeo-Vest of Texas, Inc.Mar 14, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,310
total depth, ft
3
permits on file
Mar 14, 1989
last permit issued
Aug 29, 1988
completed
0
cumulative oil, bbl
530K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 29, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Griffin Ranch G.U. 4 G-6-127844Danville (Travis Peak Cons.)Sydri Operating, LLC10530KJan 1993 – Jul 2026
Griffin Ranch G.U. 5 G-6-130218Danville (Gloyd)Sydri Operating, LLC100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Geo-Vest of Texas, Inc.Jan 1993 → Jun 2008
  2. 2Sonat Exploration Company -TylerSep 1994 → Jun 1998
  3. 3Exco Operating Company, LPJul 2008 → Jan 2013
  4. 4Exco/Hgi JV Assets, LLCFeb 2013 → Jun 2014
  5. 5Compass Energy Operating, LLCJul 2014 → Nov 2015
  6. 6Indigo Resources LLCDec 2015 → Jul 2018
  7. 7Titan Rock E&P, LLCAug 2018 → Jul 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
356656-99RecompletionGeo-Vest of Texas, Inc.Mar 3, 1989Mar 14, 1989—8,100
341224-98DrillGeo-Vest of Texas, Inc.Jul 11, 1988Jan 13, 1988—9,310
341224-99DrillGeo-Vest of Texas, Inc.Jan 11, 1988Jan 13, 1988—9,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-127844————
—— G-6-130218————

Formation tops

As filed on W-2/G-1. Subsea from 315 ft elevation.Download CSV →

FormationMD ftSubsea
Top of Massive Anhy.6,250-5,935
James Lime6,960-6,645
PettitPETTIT LIME7,200-6,885

Perforations

Perforated and open-hole intervals.

FromToType
6,7456,748Perforated
7,4217,665Perforated
8,0988,101Perforated
8,1509,283Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,06017.5650 S
13.3751,06517.5650 S
4.59,3107.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 19, 1993Oct 27, 1992—
00May 3, 1990Apr 11, 1990—
00Apr 12, 1989Feb 16, 1989Yes
00Apr 6, 1989——
00Oct 12, 1988Sep 6, 1988Yes
00Oct 4, 1988——
00Aug 9, 1988Jul 8, 1988Yes
00Jul 30, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18330721, documented in the API reference.