WELL · 42-183-31134 · DISTRICT 6

Horton, Joe Clyde O. U. No. 1 #1

N

Gregg County  · Vertical

Horton, Joe Clyde O. U. NO. 1 #1 (API 42-183-31134) is a permitted well in Gregg County filed by Geo-Vest Of Texas, Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1994 and 2004, permitted to 9,000 ft.

Completion filings report 5 formation tops, including Masive Anhydrite, Top Of Massive, Base Of Massive, Rodessa.

Its 4 leases have reported 19.3K barrels of oil and 888K mcf of gas since October 1994, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Geo-Vest of Texas, Inc.

Based in
Kilgore, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 5, 2012
Permits on file
196
Phone
(903) 643-0402

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTitan Rock E&P, LLCthrough Dec 2022
Latest permitGeo-Vest of Texas, Inc.Mar 17, 2004
9,000
total depth, ft
2
permits on file
Mar 17, 2004
last permit issued
—
completed
19.3K
cumulative oil, bbl
888K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Horton, Joe Clyde O.U. NO.1 G-6-294178Danville (TP-CV Cons.)Sydri Operating, LLC10151Sep 2022 – Jul 2026
Horton, Joe Clyde O.U. NO.1 O-6-14745Danville (TP-CV Cons.)Sydri Operating, LLC110.6K98.3KFeb 2008 – Jul 2026
Horton, Joe Clyde O.U. NO.1 O-6-14022Danville (Travis Peak Cons.)Burlington Resources O & G Co LP18.71K107KMar 2000 – Mar 2008
Akin-Ross G.U. 1 G-6-152358Danville (Travis Peak Cons.)Geo-Vest of Texas, Inc.10682KOct 1994 – Aug 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Geo-Vest of Texas, Inc.Nov 1994 → Aug 2005
  2. 2Burlington Resources O & G Co LPSep 2005 → Oct 2010
  3. 3Hilcorp Energy CompanyNov 2010 → Sep 2015
  4. 4Indigo Resources LLCOct 2015 → Jan 2017
  5. 5Titan Rock E&P, LLCOct 2018 → Dec 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
543273-99RecompletionGeo-Vest of Texas, Inc.Mar 15, 2004Mar 17, 2004—8,100
428735-99DrillGeo-Vest of Texas, Inc.Oct 3, 1994Oct 4, 1994Oct 4, 19949,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-152358————
—— G-6-294178————
—— O-6-14022————
—— O-6-14745————

Formation tops

As filed on W-2/G-1. Subsea from 377 ft elevation.Download CSV →

FormationMD ftSubsea
Masive Anhydrite6,400-6,023
Top of Massive6,400-6,023
Base of Massive6,570-6,193
RodessaBASE OF RODESSA6,570-6,193
RodessaBASE OF RODESSA6,970-6,593
James LimeTOP OF JAMES7,030-6,653

Perforations

Perforated and open-hole intervals.

FromToType
7,3907,694Perforated
7,6947,390Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,04511426 S
5.58,0987.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 31, 2023Jan 27, 2023Yes
00Mar 13, 2008Aug 9, 2000—
00Oct 10, 2000Aug 9, 2000—
00Aug 29, 2000——
00Mar 14, 1995Nov 30, 1994Yes
00Jan 26, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18331134, documented in the API reference.