TEXAS · WELLS · GREGG COUNTY · GARRETT, A.C. GU LEASE · API 42-183-31476 · DISTRICT 06

Garrett A.C. GU #6

Shut in

Gregg County · Oak Hill (Cotton Valley) field · Producing  · Vertical

Garrett A.C. GU #6 (API 42-183-31476) is a well in Gregg County operated by Tgnr East Texas LLC, completed August 24, 2001 and listed as producing on the RRC schedule, shut in July 1, 2024.

The RRC has issued one drilling permit, issued May 16, 2001, permitted to 10,680 ft.

It was permitted by Rme Petroleum Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Austin Chalk, Paluxy, Glen Rose, Massive Anhydrite (marker).

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas LLC

Permitted by Rme Petroleum Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Jun 2024
Latest permitRme Petroleum CompanyMay 16, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,680
total depth, ft
1
permits on file
May 16, 2001
last permit issued
Aug 24, 2001
completed
0
cumulative oil, bbl
972K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 24, 2001
Shut in
Jul 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garrett, A.C. GU G-6-186983Oak Hill (Cotton Valley)TGNR East Texas LLC10972KAug 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 357(-100%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rme Petroleum CompanyAug 2001 → Nov 2002
  2. 2Anadarko E&P Company LPDec 2002 → Dec 2012
  3. 3Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  4. 4Cci East Texas Upstream LLCDec 2016 → Jan 2021
  5. 5TGNR East Texas LLCFeb 2021 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
508398-99DrillRme Petroleum CompanyMay 1, 2001May 16, 2001Jun 26, 200111,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 24, 2001Garrett A.C. GU G-6-186983Oak Hill (Cotton Valley)TGNR East Texas LLCProducing · shut in Jul 1, 202410,680

Formation tops

As filed on W-2/G-1. Subsea from 326 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk2,440-2,114
Paluxy3,155-2,829
Glen RoseUPPER GLEN ROSE3,450-3,124
Massive Anhydrite (marker)MASSIVE ANHYDRITE4,882-4,556
PettitUPPER PETTIT5,840-5,514
PettitLOWER PETTIT6,002-5,676

Perforations

Perforated and open-hole intervals.

FromToType
9,0889,340Perforated
9,48410,004Perforated
10,20410,518Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,03412.25380 S
5.510,6807.8751,096 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 7, 2002Jan 31, 2002Yes
00Feb 26, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18331476, documented in the API reference.