TEXAS · WELLS · GREGG COUNTY · RUNDELL-MCWHORTER LEASE · API 42-183-31846 · DISTRICT 06
Rundell-McWhorter #2
Gregg County · Danville (TP-CV Cons.) field · Temp Abandoned · Vertical
- Fields on the latest permit · any of 2
- Danville (Travis Peak Cons.) · Danville, East (Cotton Valley)
- Not one formation; the well must be completed in one of them, and no target formation is stated.
Rundell-Mcwhorter #2 (API 42-183-31846) is a well in Gregg County operated by Sydri Operating LLC, completed June 13, 2007 and listed as temp abandoned on the RRC schedule, shut in May 1, 2024.
The RRC has issued one drilling permit, issued January 18, 2006, permitted to 10,784 ft.
It was permitted by Geo-Vest Of Texas, Inc. and has since transferred to Sydri Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Massive Anhydrite (marker), Rodessa, James Lime.
Its lease has reported 2.48K barrels of oil and 931K mcf of gas since June 2007, last reporting volume in April 2024.
Operator of record
Permitted by Geo-Vest of Texas, Inc.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 11, 2026
- Permits on file
- 46
- Phone
- (214) 373-8626
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sydri Operating LLC |
| Production reports | Sydri Operating, LLCthrough Apr 2024 |
| Latest permit | Geo-Vest of Texas, Inc.Jan 18, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,784
- total depth, ft
- 1
- permits on file
- Jan 18, 2006
- last permit issued
- Jun 13, 2007
- completed
- 2.48K
- cumulative oil, bbl
- 931K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2007 THROUGH Apr 2024
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 13, 2007
- Shut in
- May 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rundell-McWhorter G-6-229412 | Danville (TP-CV Cons.) | Sydri Operating, LLC | 1 | 2.48K | 931K | Jun 2007 – Apr 2024 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Geo-Vest of Texas, Inc.Jun 2007 → Jun 2008
- 2Exco Operating Company, LPJul 2008 → Jan 2013
- 3Exco/Hgi JV Assets, LLCFeb 2013 → Jun 2014
- 4Compass Energy Operating, LLCJul 2014 → Nov 2015
- 5Indigo Resources LLCDec 2015 → Jul 2018
- 6Titan Rock E&P, LLCAug 2018 → Sep 2023
- 7Sydri Operating, LLCOct 2023 → Apr 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 612596-99 | Drill | Geo-Vest of Texas, Inc. | Jan 18, 2006 | Jan 18, 2006 | Apr 27, 2007 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 13, 2007 | Rundell-McWhorter G-6-229412 | Danville (TP-CV Cons.) | Sydri Operating LLC | Temp Abandoned · shut in May 1, 2024 | 10,784 |
Formation tops
As filed on W-2/G-1. Subsea from 312 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive Anhydrite (marker)BASE OF MASSIVE ANHYDRITE | 6,489 | -6,177 |
| RodessaTOP OF RODESSA | 6,538 | -6,226 |
| James LimeTOP OF JAMES LIME | 6,903 | -6,591 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,105 | 10,587 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 11.75 | 1,053 | 14.75 | 600 S |
| 5.5 | 10,784 | 10.625 | 2,530 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 17, 2007 | Jul 19, 2007 | Yes |
| 00 | Sep 12, 2007 | — | — |
Well logs
1 log loaded from the RRC's log index, the latest received May 28, 2010. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Massive Anhydrite (marker), Rodessa, James Lime | TIFF | 1,053 to 10,782 | May 28, 2010run May 16, 2007 | 5.30 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-183-31846 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-183-31846 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18331846, documented in the API reference.