WELL · 42-183-31867 · DISTRICT 6

Hayes Unit #12

Y

Gregg County · Willow Springs (Travis Peak) field · SWR-10-Well  · Directional

Hayes Unit #12 (API 42-183-31867) is a well in Gregg County operated by Faulconer Energy LLC, completed March 23, 2010 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits between 2006 and 2009, permitted to 11,065 ft.

It was permitted by Xto Energy Inc. and has since transferred to Faulconer Energy LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Austin Chalk, Glen Rose, Pettie, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Faulconer Energy LLC

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Tyler, TX
P-5 status
Active (A)
P-5 last filed
Oct 29, 2025
Permits on file
46
Phone
(903) 581-4382

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFaulconer Energy LLC
Production reportsFaulconer Energy, LLCthrough Apr 2026
Latest permitXTO Energy Inc.Dec 11, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,065
total depth, ft
2
permits on file
Dec 11, 2009
last permit issued
Mar 23, 2010
completed
0
cumulative oil, bbl
1.53M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 23, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hayes Unit G-6-227653Willow Springs (Cotton Valley)Faulconer Energy, LLC101.53MApr 2007 – Jul 2026
Hayes Unit G-6-258136Willow Springs (Travis Peak)Faulconer Energy, LLC100Mar 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 34,193 · prior 12 31,133(+10%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hunt Petroleum CorporationMay 2007 → Nov 2008
  2. 2XTO Energy Inc.Dec 2008 → Mar 2023
  3. 3Faulconer Energy, LLCApr 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
687454-99RecompletionXTO Energy Inc.Nov 16, 2009Dec 11, 2009Jan 12, 201011,065
615337-99DrillHunt Petroleum CorporationMar 6, 2006Apr 27, 2006Mar 5, 200710,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-227653————
—— G-6-258136————

Formation tops

As filed on W-2/G-1. Subsea from 334 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk3,659-3,325
Glen RoseUPPER GLEN ROSE5,185-4,851
Pettie7,466-7,132
Pettit7,466-7,132
Cotton Valley9,275-8,941

Perforations

Perforated and open-hole intervals.

FromToType
7,6579,258Perforated
9,27610,567Perforated
10,60810,704Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1663——
9.6254,68412.251,760 S
4.511,0657.8751,360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 14, 2010Jul 19, 2010—
00Dec 3, 2010——
00Jul 9, 2007Jun 14, 2007—
00Jul 6, 2007Apr 27, 2007Yes
00Jul 3, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18331867, documented in the API reference.