WELL · 42-185-30437 · DISTRICT 3
Dalbosco Unit #1RE
Grimes County · Horizontal
Dalbosco Unit #1RE (API 42-185-30437) is a permitted horizontal well in Grimes County filed by Anadarko E&P Company LP; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended once) between 1993 and 2007, permitted to 11,184 ft.
Completion filings report 4 formation tops, including Midway, Navarro, Pecan Gap, Austin Chalk.
Its lease has reported 177K barrels of oil and 676K mcf of gas since June 1994, last reporting in July 2026.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Sep 27, 2012
- Permits on file
- 2,635
- Phone
- (832) 636-3130
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Enervest Operating, L.L.C.through May 2012 |
| Latest permit | Anadarko E&P Company LPApr 25, 2007 |
- 11,184
- total depth, ft
- 3
- permits on file
- Apr 25, 2007
- last permit issued
- —
- completed
- 177K
- cumulative oil, bbl
- 676K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dalbosco Unit O-3-22514 | Giddings (Austin Chalk-3) | Magnolia Oil & Gas Operating LLC | 1 | 177K | 676K | Jun 1994 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanyJul 1994 → Jan 2001
- 2Rme Petroleum CompanyFeb 2001 → Nov 2002
- 3Anadarko E&P Company LPDec 2002 → Jul 2007
- 4Enervest Operating, L.L.C.Aug 2007 → Apr 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 637137-99 | Recompletion | Anadarko E&P Company LP | Apr 16, 2007 | Apr 25, 2007 | — | 10,000 |
| 413227-98 | Drill | Union Pacific Resources Company | Sep 20, 1994 | Jul 1, 1993 | — | 11,184 |
| 413227-99 | Drill | Union Pacific Resources Company | Jun 28, 1993 | Jul 1, 1993 | May 22, 1994 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-22514 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 205 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Midway | 1,726 | -1,521 |
| Navarro | 8,031 | -7,826 |
| Pecan Gap | 10,341 | -10,136 |
| Austin Chalk | 10,766 | -10,561 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,858 | 14,860 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,500 | 14.75 | 1,113 S |
| 7.625 | 10,828 | 9.875 | 862 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 13, 1994 | Aug 22, 1994 | Yes |
| 00 | Oct 6, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-185-30437 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-185-30437 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18530437, documented in the API reference.