TEXAS · WELLS · GRIMES COUNTY · TMPA UNIT LEASE · API 42-185-30752 · DISTRICT 03

Tmpa Unit #2

Y

Grimes County · Giddings (Austin Chalk-3) field · Producing  · Horizontal

Tmpa Unit #2 (API 42-185-30752) is a horizontal well in Grimes County operated by Magnolia Oil & Gas Operating LLC, completed May 6, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 19, 2010, permitted to 10,778 ft.

It was permitted by Enervest Operating, L.L.C. and has since transferred to Magnolia Oil & Gas Operating LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Wilcox, Midway, Navarro, Pecan Gap.

Its lease has reported 67.9K barrels of oil and 824K mcf of gas since May 2011, last reporting in July 2026.

Operator of record

Magnolia Oil & Gas Operating LLC

Permitted by Enervest Operating, L.L.C.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 6, 2026
Permits on file
615
Phone
(713) 842-9050

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnolia Oil & Gas Operating LLC
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitEnervest Operating, L.L.C.Jul 19, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,778
total depth, ft
1
permits on file
Jul 19, 2010
last permit issued
May 6, 2011
completed
67.9K
cumulative oil, bbl
824K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 6, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tmpa Unit O-3-25711Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC167.9K824KMay 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 839 · prior 12 8,507(-90%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 62 · prior 12 665(-91%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enervest Operating, L.L.C.May 2011 → Jul 2018
  2. 2Magnolia Oil & Gas Operating LLCAug 2018 → Jun 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
699062-99DrillEnervest Operating, L.L.C.Jul 15, 2010Jul 19, 2010Feb 11, 201112,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 6, 2011Tmpa Unit O-3-25711Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLCProducing10,778

Formation tops

As filed on W-2/G-1. Subsea from 267 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox2,858-2,591
Midway6,908-6,641
Navarro8,298-8,031
Pecan Gap10,158-9,891
Austin Chalk10,515-10,248

Perforations

Perforated and open-hole intervals.

FromToType
10,91815,500Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,51314.751,557 S
7.62510,9189.875732 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 6, 2012Jun 6, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18530752, documented in the API reference.