TEXAS · WELLS · GUADALUPE COUNTY · SCHIEVELBIEN, ALBERT LEASE · API 42-187-31122 · DISTRICT 01

Schievelbien Albert #3

Shut in

Guadalupe County · La Vernia field · NO Production  · Vertical

Schievelbien Albert #3 (API 42-187-31122) is a well in Guadalupe County operated by Tanglehead Operating LLC, completed April 20, 1980 and listed as no production on the RRC schedule, shut in September 1, 2022.

The RRC has issued one drilling permit, issued February 19, 1980, permitted to 1,100 ft.

It was permitted by Seaco Production and has since transferred to Tanglehead Operating LLC on the wellbore schedule.

Its lease has reported 16.2K barrels of oil and 95 mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 20 wells, so these are lease totals, not this well alone.

Operator of record

Tanglehead Operating LLC

Permitted by Seaco Production; the EWA schedule now lists a different operator.

Based in
La Vernia, TX
P-5 status
Delinquent (D)
P-5 last filed
Feb 19, 2025
Phone
(979) 575-3678

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTanglehead Operating LLC
Production reportsTanglehead Operating, LLCthrough Aug 2022
Latest permitSeaco ProductionFeb 19, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,100
total depth, ft
1
permits on file
Feb 19, 1980
last permit issued
Apr 20, 1980
completed
16.2K
cumulative oil, bbl
95
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2022

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 20, 1980
Shut in
Sep 1, 2022
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schievelbien, Albert O-1-6012La VerniaTanglehead Operating, LLC2016.2K95Jan 1993 – Aug 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Seaco ProductionJan 1993 → Feb 2016
  2. 2Seay Oil & Gas, Ltd.Apr 2000 → Feb 2002
  3. 34F Energy, LLCMar 2016 → Dec 2017
  4. 4Tanglehead Operating, LLCJan 2018 → Aug 2022
  5. 5J.A.G. Oil & GasAug 2020 → Nov 2020
  6. 6Luling Well ServiceDec 2020 → Jul 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
72831-99DrillSeaco ProductionFeb 19, 1980Feb 19, 1980—1,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 20, 1980Schievelbien Albert O-1-6012La VerniaTanglehead Operating LLCNO Production · shut in Sep 1, 20221,100

Perforations

Perforated and open-hole intervals.

FromToType
1,0221,026Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,000——
4.51,0756.75110 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Apr 29, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18731122, documented in the API reference.