WELL · 42-187-33211 · DISTRICT 1
Schertz Elton #19A
Guadalupe County · LA Vernia field · Vertical
Schertz Elton #19A (API 42-187-33211) is a well in Guadalupe County operated by Production Resources Inc., completed October 1, 1981.
The RRC has issued one drilling permit, issued April 21, 1987, permitted to 1,000 ft.
It was permitted by Half Fast Oil Company and has since transferred to Production Resources Inc. on the wellbore schedule.
Completion filings report one formation top, including Navarro.
Its 2 leases have reported 6.06K barrels of oil and 122 mcf of gas since January 1993, last reporting in July 2026. The leases carry 33 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Half Fast Oil Company; the EWA schedule now lists a different operator.
- Based in
- Castroville, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 5, 2026
- Permits on file
- 56
- Phone
- (210) 323-7818
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Production Resources Inc. |
| Production reports | Production Resources, Inc.through Apr 2026 |
| Latest permit | Half Fast Oil CompanyApr 21, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,000
- total depth, ft
- 1
- permits on file
- Apr 21, 1987
- last permit issued
- Oct 1, 1981
- completed
- 6.06K
- cumulative oil, bbl
- 122
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 1, 1981
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 33 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Schertz, Elton O-1-940 | LA Vernia | Production Resources, Inc. | 28 | 5.95K | 122 | Jan 1993 – Jul 2026 |
| Schneider, Kasey O-1-19655 | LA Vernia | Production Resources, Inc. | 5 | 111 | 0 | Jan 2019 – Jul 2026 |
Oil, barrels lease total
Last 12 months 12 · prior 12 15(-20%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seguin PumpJan 1993 → Sep 2017
- 2Advantagewon Oil, US, Corp.Jan 2018 → Sep 2019
- 3Production Resources, Inc.Feb 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 329128-99 | Drill | Half Fast Oil Company | Apr 17, 1987 | Apr 21, 1987 | — | 1,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-940 | — | — | — | — |
| — | — O-1-19655 | — | — | — | — |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 940 | 7.875 | 236 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 2019 | Jun 16, 1987 | — |
| 00 | Jul 23, 1987 | Jun 16, 1987 | — |
| 00 | Jul 14, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-187-33211 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-187-33211 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18733211, documented in the API reference.