WELL · 42-187-80861 · DISTRICT 1

Woehler, Herman E. #1 D

N

Guadalupe County  · Vertical

Woehler, Herman E. #1 D (API 42-187-80861) is a former disposal or injection well in Guadalupe County, last operated by R & S Production; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued June 7, 1983, permitted to 3,000 ft.

Operator of record

R & S Production

Based in
Luling, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 22, 1983
Permits on file
2
Phone
(210) 875-3975

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitR & S ProductionJun 7, 1983
3,000
total depth, ft
1
permits on file
Jun 7, 1983
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
197520-99OtherR & S ProductionJun 7, 1983Jun 7, 1983—3,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Dec 1989
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000051378W-14 DisposalCanceled Jun 4, 19922603002,400–2,550

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011989

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18780861, documented in the API reference.