WELL · 42-195-30975 · DISTRICT 10

Gertrude #1

Y

Hansford County · Shapley (Morrow) field · Temp Abandoned  · Vertical

Gertrude #1 (API 42-195-30975) is a well in Hansford County operated by Mewbourne Oil Company, completed June 26, 2002 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued November 8, 1985, permitted to 7,600 ft.

It was permitted by Strat Land Exploration Company and has since transferred to Mewbourne Oil Company on the wellbore schedule.

Completion filings report 6 formation tops, including Brn Dlolmite, Brn Dolomite, Brown Dolomite, Pennsylvanian.

No lease production has been reported under this well’s leases.

Operator of record

Mewbourne Oil Company

Permitted by Strat Land Exploration Company; the EWA schedule now lists a different operator.

Based in
Tyler, TX
P-5 status
Active (A)
P-5 last filed
May 21, 2026
Permits on file
2,061
Phone
(903) 561-2900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMewbourne Oil Company
Production reportsMewbourne Oil Companythrough Jan 2025
Latest permitStrat Land Exploration CompanyNov 8, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,600
total depth, ft
1
permits on file
Nov 8, 1985
last permit issued
Jun 26, 2002
completed
0
cumulative oil, bbl
684K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 26, 2002
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gertrude G-14-122698Shapley (Morrow)Mewbourne Oil Company10684KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 9,201(-100%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Strat Land Exploration CompanyJan 1993 → Sep 2022
  2. 2Mewbourne Oil CompanyOct 2022 → Jan 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
290075-99DrillStrat Land Exploration CompanyNov 7, 1985Nov 8, 1985Dec 9, 19857,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-122698————

Formation tops

As filed on W-2/G-1. Subsea from 3,139 ft elevation.Download CSV →

FormationMD ftSubsea
BRN Dlolmite2,825314
BRN Dolomite2,825314
Brown Dolomite2,825314
PennsylvanianPENN SH4,174-1,035
PennsylvanianPENN SHALE4,174-1,035
Des Moines5,410-2,271
MorrowMORROW SH6,599-3,460
MorrowMORROW SHALE6,599-3,460

Perforations

Perforated and open-hole intervals.

FromToType
6,6826,689Perforated
6,7726,784Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,60212.25710 S
4.57,4007.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 8, 2002Aug 30, 2002—
00Sep 27, 2002Aug 19, 2002—
00Sep 17, 2002Aug 19, 2002—
00Aug 18, 1987Jul 8, 1987Yes
00Feb 13, 1987Jan 2, 1987Yes
00Jan 13, 1987Nov 14, 1986—
00Dec 30, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19530975, documented in the API reference.