WELL · 42-195-31168 · DISTRICT 10

Lemma -B- #2

Y

Hansford County · Freeman Ranch (Oswego) field · Temp Abandoned  · Vertical

Lemma -B- #2 (API 42-195-31168) is a well in Hansford County operated by Burk Royalty CO. Ltd., completed June 8, 1993 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued November 24, 1992, permitted to 8,260 ft.

It was permitted by Phillips Petroleum Company and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.

Completion filings report 6 formation tops, including Panhandle Lime, Hugoton, Council Grove, Lansing.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Burk Royalty Co. Ltd.

Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Permits on file
382
Phone
(940) 397-8600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurk Royalty Co. Ltd.
Production reportsnone
Latest permitPhillips Petroleum CompanyNov 24, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,260
total depth, ft
1
permits on file
Nov 24, 1992
last permit issued
Jun 8, 1993
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 8, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lemma -B- G-14-145147Freeman Ranch (Oswego)Burk Royalty Co., Ltd.100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
406544-99DrillPhillips Petroleum CompanyNov 24, 1992Nov 24, 1992Dec 2, 19928,260

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-145147————

Formation tops

As filed on W-2/G-1. Subsea from 3,150 ft elevation.Download CSV →

FormationMD ftSubsea
Panhandle Lime2,254896
Hugoton2,550600
Council Grove3,021129
Lansing4,490-1,340
Kansas City4,850-1,700
Atoka6,180-3,030

Perforations

Perforated and open-hole intervals.

FromToType
4,5034,513Perforated
4,5254,537Perforated
4,5444,550Perforated
4,5994,607Perforated
4,6374,651Perforated
4,6664,673Perforated
4,6874,701Perforated
4,7614,772Perforated
4,8594,866Perforated
4,8754,881Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2053——
9.6251,92214.751,300 S
78,1648.75240 S
7—8.75600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 15, 1993Aug 11, 1993—
00May 28, 1993Apr 21, 1993—
00May 25, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
389K
bbl, all reported
Mar 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000078927W-14 DisposalActive15,0001,5004,075–4,900

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19531168, documented in the API reference.