WELL · 42-195-31353 · DISTRICT 10

Williams 6 #1

N

Hansford County · Collard (White Dolomite) field  · Horizontal

Williams 6 #1 (API 42-195-31353) is a horizontal well in Hansford County operated by Jones Energy Ltd., completed February 10, 1998.

The RRC has issued 2 drilling permits (amended once) between 1997 and 2000, permitted to 4,000 ft.

Completion filings report 5 formation tops, including Panhandle, Pndl, Chase, Upper Krider.

No lease production has been reported under this well’s leases.

Operator of record

Jones Energy Ltd.

Based in
Austin, TX
P-5 status
Delinquent (D)
P-5 last filed
Feb 2, 2012
Permits on file
672
Phone
(512) 328-2953

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJones Energy Ltd.
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitJones Energy, Ltd.Feb 11, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
3
permits on file
Feb 11, 2000
last permit issued
Feb 10, 1998
completed
0
cumulative oil, bbl
802K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 10, 1998
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Williams 6 G-14-177225Patten (Krider)Latigo Petroleum, LLC10752KMar 2000 – Jul 2026
Williams 6 G-14-168429Collard (White Dolomite)Jones Energy, Ltd.10304Feb 1998 – Mar 2000
Williams 6 G-14-168430Collard (Council Grove)Jones Energy, Ltd.1049.5KMar 1998 – Mar 2000

Gas, mcf lease total

Last 12 months 1,464 · prior 12 1,001(+46%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Energy, Ltd.Feb 1998 → May 2007
  2. 2Laredo Petroleum, Inc.Jun 2007 → Jul 2013
  3. 3Enervest Operating, L.L.C.Aug 2013 → Oct 2015
  4. 4BP America Production CompanyNov 2015 → May 2017
  5. 5Latigo Petroleum, LLCDec 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
491839-99RecompletionJones Energy, Ltd.Feb 7, 2000Feb 11, 2000Feb 21, 20004,000
471260-98DrillJones Energy, Ltd.Apr 6, 1998Dec 15, 1997—4,000
471260-99DrillJones Energy, Ltd.Dec 15, 1997Dec 15, 1997Jan 7, 19984,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-168429————
—— G-14-168430————
—— G-14-177225————

Formation tops

As filed on W-2/G-1. Subsea from 3,186 ft elevation.Download CSV →

FormationMD ftSubsea
Panhandle2,347839
Pndl2,347839
Chase3,084102
Upper Krider3,236-50
Fort Filey3,526-340

Perforations

Perforated and open-hole intervals.

FromToType
3,2015,016Perforated
3,4223,426Perforated
3,7473,750Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,26712.25608 S
5.53,8907.875135 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 7, 2000Apr 17, 2000Yes
00Jun 15, 2000——
00Jul 15, 1998Apr 7, 1998Yes
00Jun 16, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19531353, documented in the API reference.