WELL · 42-195-31575 · DISTRICT 10

Holt 156 #1

Plugged

Hansford County · Hansford (Mississippian) field  · Vertical

Holt 156 #1 (API 42-195-31575) is a plugged well in Hansford County, plugged January 27, 2022, last operated by Mewbourne Oil Company.

The RRC has issued one drilling permit (amended once), issued September 30, 2002, permitted to 7,600 ft.

Completion filings report 8 formation tops, including Patten (Krider), Pattern (Kinder), Hunter (White Dolomite), Hunter (Coucil Grove).

Operator of record

Mewbourne Oil Company

Based in
Tyler, TX
P-5 status
Active (A)
P-5 last filed
May 21, 2026
Permits on file
2,061
Phone
(903) 561-2900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMewbourne Oil Company
Production reportsMewbourne Oil Companythrough Feb 2021
Latest permitMewbourne Oil Co.Sep 30, 2002
7,600
total depth, ft
2
permits on file
Sep 30, 2002
last permit issued
Apr 28, 2003
completed
0
cumulative oil, bbl
379K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2002 THROUGH Jan 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 28, 2003
Shut in
—
Plugged
Jan 27, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Holt "156" G-14-192845Patten (Krider)Mewbourne Oil Company105.31KDec 2002 – Jan 2022
Holt "156" G-14-195440Hansford (Mississippian)Mewbourne Oil Company1027.7KFeb 2003 – Jan 2022
Holt "156" G-14-195448Hunter (Council Grove)Mewbourne Oil Company10346KApr 2003 – Jan 2022
Holt "156" G-14-195450Hunter (White Dolomite)Mewbourne Oil Company100Apr 2003 – Jan 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mewbourne Oil CompanyDec 2002 → Feb 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
523325-98DrillMewbourne Oil Co.Dec 4, 2002Sep 30, 2002Nov 9, 20027,600
523325-99DrillMewbourne Oil Co.Sep 3, 2002Sep 30, 2002—7,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 28, 2003Holt 156 G-14-192845Patten (Krider)Mewbourne Oil CompanyPlugged—
Apr 28, 2003Holt 156 G-14-195450Hunter (White Dolomite)Mewbourne Oil CompanyPlugged—
Apr 28, 2003Holt 156 G-14-195448Hunter (Council Grove)Mewbourne Oil CompanyPlugged—
Apr 28, 2003Holt 156 G-14-195440Hansford (Mississippian)Mewbourne Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,080 ft elevation.Download CSV →

FormationMD ftSubsea
Patten (Krider)3,092-12
Pattern (Kinder)3,092-12
Hunter (White Dolomite)3,300-220
Hunter (Coucil Grove)3,611-531
Hunter (Council Grove)3,611-531
Atoka6,624-3,544
Morrow6,694-3,614
Mississippian7,060-3,980

Perforations

Perforated and open-hole intervals.

FromToType
3,0953,144Perforated
3,0963,104Perforated
3,0963,144Perforated
3,3053,309Perforated
3,3933,309Perforated
3,6143,690Perforated
7,1197,134Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,48811625 S
5.57,3507.875325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 2003May 27, 2003—
00Jul 25, 2003May 27, 2003—
00Jul 25, 2003Apr 1, 2003—
00Jul 15, 2003——
00Jul 14, 2003——
00Mar 12, 2003Jan 14, 2003Yes
00Feb 13, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19531575, documented in the API reference.