TEXAS · WELLS · HANSFORD COUNTY · MATHEWS LEASE · API 42-195-31749 · DISTRICT 08

Mathews #2102

Y

Hansford County · Hansford (Morrow Upper) field · Producing  · Vertical

Mathews #2102 (API 42-195-31749) is a well in Hansford County operated by Latigo Petroleum LLC, completed August 22, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 12, 2006, permitted to 9,125 ft.

It was permitted by Jones Energy, Ltd. and has since transferred to Latigo Petroleum LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Douglas, Top 13 Fingers, Morrow, Top Mop.

No lease production has been reported under this well’s leases.

Operator of record

Latigo Petroleum LLC

Permitted by Jones Energy, Ltd.; the EWA schedule now lists a different operator.

Based in
Pampa, TX
P-5 status
Active (A)
P-5 last filed
Jul 17, 2025
Permits on file
76
Phone
(806) 665-8441

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLatigo Petroleum LLC
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitJones Energy, Ltd.Jul 12, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,125
total depth, ft
2
permits on file
Jul 12, 2006
last permit issued
Aug 22, 2007
completed
0
cumulative oil, bbl
1.45M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 22, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mathews G-14-231295Hansford (Morrow, Upper)Latigo Petroleum, LLC101.45MAug 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 10,656 · prior 12 14,669(-27%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Laredo Petroleum, Inc.Aug 2007 → Jul 2013
  2. 2Enervest Operating, L.L.C.Aug 2013 → Oct 2015
  3. 3BP America Production CompanyNov 2015 → Feb 2020
  4. 4Latigo Petroleum, LLCMar 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
620291-98DrillJones Energy, Ltd.Jul 16, 2007Jul 12, 2006Jul 12, 20079,600
620291-99DrillJones Energy, Ltd.Jun 1, 2006Jul 12, 2006Jul 12, 20077,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 22, 2007Mathews G-14-231295Hansford (Morrow Upper)Latigo Petroleum LLCProducing9,125

Formation tops

As filed on W-2/G-1. Subsea from 2,926 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas4,896-1,970
Top 13 Fingers6,732-3,806
MorrowMID MORROW7,258-4,332
Top Mop7,483-4,557

Perforations

Perforated and open-hole intervals.

FromToType
7,2587,278Perforated
8,6528,657Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,60011465 S
5.59,1257.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 8, 2008Sep 27, 2007Yes
00Dec 7, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19531749, documented in the API reference.