WELL · 42-197-00031 · DISTRICT 9
Self #1
Hardeman County · Vertical
Self #1 (API 42-197-00031) is a permitted well in Hardeman County filed by Farrex, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1984 and 1992, permitted to 8,500 ft.
Completion filings report 4 formation tops, including Megargle, Swastika, Canyon, Palo Pinto.
Its lease has reported 2.48K barrels of oil and 43 mcf of gas since January 1993, last reporting in September 1997.
Operator of record
Vernon, TX · P-5 Y, filed May 5, 1995 · 10 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Farrell Oil Companythrough Oct 1996 |
| Latest permit | Farrex, Inc.Nov 18, 1992 |
- 8,500
- total depth, ft
- 3
- permits on file
- Nov 18, 1992
- last permit issued
- —
- completed
- 2.48K
- cumulative oil, bbl
- 43
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Self O-13-25051 | Chillicothe (Palo Pinto) | Smith Pipe of Abilene | 1 | 2.48K | 43 | Jan 1993 – Sep 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Farrex, Inc.Feb 1993 → Jun 1994
- 2Farrell Oil CompanyJul 1994 → Oct 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 405979-99 | Recompletion | Farrex, Inc. | Nov 12, 1992 | Nov 18, 1992 | — | 8,500 |
| 248552-99 | Recompletion | Huber, J. M., Corporation | Jul 18, 1984 | Aug 13, 1984 | — | 8,500 |
| 244299-99 | Recompletion | Huber, J. M., Corporation | Jul 6, 1984 | Jul 6, 1984 | — | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-25051 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,411 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Megargle | 3,937 | -2,526 |
| Swastika | 4,275 | -2,864 |
| CanyonUPPER CANYON SAND | 4,871 | -3,460 |
| CanyonLOWER CANYON SAND | 5,221 | -3,810 |
| Palo Pinto | 5,658 | -4,247 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,658 | 5,676 | Perforated |
| — | 4,279 | Perforated |
| — | 4,873 | Perforated |
| — | 5,676 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 328 | 12.25 | 190 S |
| 5.5 | 7,130 | 7.625 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 24, 1997 | Jan 7, 1997 | — |
| 00 | May 9, 1985 | Dec 10, 1984 | — |
| 00 | Mar 5, 1985 | Dec 10, 1984 | — |
| 00 | Feb 15, 1985 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-00031 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-00031 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.